
Note
Action
How to drain the gearbox is described
in section:
•
Changing the oil, axis-2 gearbox
on page 162
Axis-2 motor:
•
The gearbox has to be drained before
removing the motor.
2
How to drain the gearbox is described
in section:
•
Changing the oil, axis-3 gearbox
on page 166
Axis-3 motor:
•
The gearbox has to be drained before
removing the motor.
3
-
Axis-4, axis-5 and axis-6 motors:
•
Draining of gearbox oil is not needed if
robot is positioned as recommended.
4
Removing motors
Use this procedure to remove the axis-1, axis-2, axis-3, axis-4, axis-5 and axis-6
motors.
Note
The procedure contains information how to remove motors on all axes of the
robot. Some steps are only applicable to a certain motor. Follow the steps
carefully in order not to miss vital information!
Note
Action
See:
•
Move the robot to the recommended position
for the motor that shall be removed.
1
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot working
area.
2
See:
•
Check if the gearbox needs to be drained.
3
Continues on next page
282
3HAC033453-001 Revision: H
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.7.1 Removing motors
Continued
Содержание IRB 4600 - 40/2.55
Страница 1: ...ABB Robotics Product manual IRB 4600 ...
Страница 2: ...Trace back information Workspace R13 2 version a3 Checked in 2013 10 15 Skribenta version 4 0 378 ...
Страница 8: ...371 Index 8 3HAC033453 001 Revision H Copyright 2009 2013 ABB All rights reserved Table of contents ...
Страница 108: ...This page is intentionally left blank ...
Страница 318: ...This page is intentionally left blank ...
Страница 332: ...This page is intentionally left blank ...
Страница 373: ......