
ABB n.v.
Power Quality Products
Avenue Centrale, 10
Zoning Industriel de Jumet
B-6040 Charleroi (Jumet), Belgium
Phone: +32 (0) 71 250 811
Fax:
+32 (0) 71 344 007
Email: [email protected]
© Copyright 2011 ABB - 2GCS222021A0050 - July 2011
Step 4
Step 3
(c)
(d)
Step 5
(e)
Step 3: Insert the mounting bracket (c) in the corresponding
fixation holes (d) of the RVT.
Step 4: Pull the mounting bracket backwards.
Step 5: Place the 1st IP54 sealing gasket between the
front panel and the cubicle.
Step 6: Turn lightly the screw (e) into the mounting brackets.
Step 7: If any hole still exists (check the corners of the
controller) a 2nd IP54 can be placed around the 1st one.
Repeat steps 3 to 5 for
the bottom mounting
bracket.
Step 8: Push on the gasket on 4 sides of the RVT to insert
it between the cubicle and the RVT enclosure so the gas-
ket becomes invisible.
Step 9: Turn the screw (e) into the mounting brackets and tigh-
ten until the RVT is secured in place.