ABB IP54 Скачать руководство пользователя страница 2

ABB n.v. 
Power Quality Products

Avenue Centrale, 10
Zoning Industriel de Jumet 
B-6040 Charleroi (Jumet), Belgium 
Phone: +32 (0) 71 250 811 
Fax: 

+32 (0) 71 344 007

Email: [email protected] 

© Copyright 2011  ABB - 2GCS222021A0050 - July 2011

Step 4

Step 3
(c)

(d)

Step 5
(e)

Step 3: Insert the mounting bracket (c) in the corresponding 
fixation holes (d) of the RVT.

Step 4: Pull the mounting bracket backwards.

Step 5: Place the 1st IP54 sealing gasket between the 
front panel and the cubicle.

Step 6: Turn lightly the screw (e) into the mounting brackets.

Step 7: If any hole still exists (check the corners of the 
controller) a 2nd IP54 can be placed around the 1st one.

Repeat steps 3 to 5 for 
the bottom mounting 
bracket.

Step 8: Push on the gasket on 4 sides of the RVT to insert 
it between the cubicle and the RVT enclosure so the gas-
ket becomes invisible.

Step 9: Turn the screw (e) into the mounting brackets and tigh-
ten until the RVT is secured in place.

Отзывы: