Operation Manual / A150-M56/66/57/67 - A155-M..
13 Removing and installing 6-nozzle turbine cleaning component (op-
tional) / 13.1 Disassembly
© Copyright 2021 ABB. All rights reserved.
HZTL4032_EN
Rev.Q
January 2021
Fig. 118: Disassembly of the elbows
u
Remove the elbows (51311) from the connecting pieces (51313) in the specified order (01,
02, 03, 04, 05).
Fig. 119: Pipe disassembly
1. Undo union nuts (51316) of pipe (51312).
2. Remove pipe.
Page
159
/
194
Содержание HT605172
Страница 2: ......