![ABB HT584082 Скачать руководство пользователя страница 120](http://html1.mh-extra.com/html/abb/ht584082/ht584082_operation-manual_4250853120.webp)
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 118
© Copyright 2016 ABB. All rights reserved.
A
ug
us
t2
01
7
H
ZT
L2
41
2_
E
N
R
ev
is
io
n
F
*) Diameter for turbine casing designs for optional C-ring sealing
NOTICE
Information about the turbine casing design (with / without C-ring seal-
ing) can be requested from an ABB Turbocharging Service Station.