Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Inspection work
3.2
Page 39
Apr
il 20
15
H
ZT
L24
12_
EN
R
ev
is
ion E
Inspection work
3.2
Inspection work includes preventive visual controls plus monitoring and
measuring work before and during commissioning. Inspections help detect
changes to the turbocharger. Machine damage can be avoided.
Inspection before commissioning
Check for correct functioning.
Inspect for damage.
Check oil filter for cleanliness before commissioning.
CAUTION
Contaminated oil
Particles of dirt and solid matter in the oil can cause serious damage to
the machine or property.
During initial commissioning and after all service work, the complete
lubricating system must be flushed thoroughly with warm oil.
When running in the engine and after all service work on the
lubricating system, special running-in filters must be used.
Check the oil pressure in the oil supply lines.
CAUTION
Prelubrication
Serious machine or property damage might result if the turbocharger is
not supplied with oil when the engine is starting.
Activate prelubrication device before starting engine.
3.2
3.2.1
Monitoring measures /
equipment
Air filter mat
Lubricating system
© Copyright 2015 ABB. All rights reserved.