2
R E LI AG E A R LI G HTI NG PA N E LBOA R DS - FOR SCR E W COVE R FRONTS ( WITH 5" FRONT E X TE N S ION)
1T
QC
17
30
0
0
E
0
02
4
,G
E
H
53
10
,J
A
N
202
0
—
ABB Inc.
305 Gregson Drive
Cary, NC 27511
©Copyright 2020 ABB. All rights reserved.
Information provided is subject to change without notice. Please verify all details with ABB. All values are design or typical
values when measured under laboratory conditions, and ABB makes no warranty or guarantee, express or implied, that such
performance will be obtained under end-use conditions.
ReliaGear is a registered trademarks of ABB Inc.
GE is a registered trademark used under license from General Electric company.
electrification.us.abb.com
Instructions for Mounting
Screw-on fronts with two 5" front extensions mounted to provide
for a single 10" gutter.
Note:
1. Panelboard interior mounting screws in box must
be moved so interior can be offset to accommodate
either a left or right side mounted additional 10"
gutter. Positioning of box is critical for proper
orientation of 10" gutter relative to line in/load out
conditions. Interior mounting screws can only be
offset to one side of box.
2. Push speed nuts onto box flange and both
extension flanges.
3. Orientate nuts to face into box. Bolt extensions
together and attach them to the proper side of the
front with 1" long trim screws.
4. Attach front with extensions to box with 1" long
trim screws.
Front
Speed
Nuts
Trim Screws
Interior
Mounting
Screws
30" Wide Box
Two 5" Front
Extensions
(Right Side Mounted)