CHECKS BEFORE LOADING THE BREAKER
Rev. A
PROCEDURE FOR QUALITY CHECKS OF
DR IEC ENTELLIGUARD G FAMILY
Doc.N°
1SDH00XXXXX
Page N°
2. CHECK THE TERMINALS ALIGNMENT AS PER DRAWING / INSTRUCTION SHEET.
Before rack-in check whether all the terminals mounted on the breaker are aligned properly as instructed in the
Must ensure that the racking handle is not inserted before and during loading the breaker. Handle should only be
.
3. RACK-IN HANDLE NOT INSERTED BEFORE AND DURING LOADING THE BREAKER.
inserted when the breaker is pushed inside the cassette to dead end condition.
.
.drawing or the instruction sheet.
.
4. GREASE APPLICATION.
Visual check of grease application on cluster fingers of moving portion.
.