ABB | SACE Emax 2
Emax E1.2 circuit-breakers | 4 - Description
17 | © 2017
ABB |
1SDH000999R0002 - ECN000058721 - Rev. B
Mechanical status indicators
The following are the possible states in which you can find the circuit-breaker:
1. Circuit-breaker open with springs discharged (see Figure 25).
2. Circuit-breaker open with springs charged (see Figure 26).
3. Circuit-breaker closed with springs discharged (see Figure 27).
4. Circuit-breaker closed with springs charged (see Figure 28). This state occurs when after closing (see
step 4 - Figure 28) the springs are recharged manually or automatically by the gearmotor (if provided).
Figure 25
Figure 26
Figure 27
Figure 28