22 - For AKR 30/50/T50 AKD-6 Retrofill Breaker
Figure 19
AKD-6 Removal of Rail Defeat Latches AKR 30/50/T50
3.Install the tool into either the Lower or Upper Center Slot in the switchgear inner housing
as shown Fig.20. Locate the tool hanging inside of the left side frame Emax2 Circuit breaker.
Figure 20
Breaker Installation Tool mounted on AKD-6 compartment sides (LH & RH)
4. Push the breaker into the compartment until it hits the stop due to installed
breaker installation tool (fig 20).
5. Push the breaker and sliding rails fully into the compartment.
6. Latch the inner rail with outer rail (fig. 23) by rotating the rail lever
7. Store the Loading Stop Tool back on the left side frame of the breaker
8. Now the new retrofill breaker can be racked in, using the racking mechanism provided in
the breaker.
9. Follow the procedure steps from 15 to 25 as described for installing AKR 30/50/T50 retrofill
breaker
LH side Stationary Rail
RH side Stationary Rail
1. After the legacy breaker is removed. Check that everything in the compartment looks good,
clean, aligned, not bent, not overheating.
2. Remove the thin sheet metal locking levers on both sides of the compartment as shown in
Figures 19. This will be done with a punch of a slightly smaller diameter than the 1/8”
roll pin being removed. Drive out the pins. Remove both right and left side levers, torsion
springs and roll pins as shown in Figures 19.
©2022 Emax 2 Retrofill Circuit Breakers 800A-4000A 25
2TSA451014P0000 Rev-B