![ABB EIB Delta Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/abb/eib-delta/eib-delta_user-manual_4388025.webp)
EIB Delta-Meter
Electricity Meters
24
ABB i-bus
®
EIB
4.7
Parameter window: Status
The behaviour of the communication objects “Fault”, “Fault acknowledgement”
and “Status byte” is defined in the “Status” parameter window.
Fault acknowledgement:
If “no” is selected, a telegram is sent via the
communication object “Fault” via the ABB i-bus
®
EIB after the first
occurrence of a fault in the meter and once the transmission delay T
W
has
elapsed (if selected). The corresponding bits in the status byte object are set
at the same time. These bits are set or reset after each new fault or after
each removal of an fault. If all faults have been rectified, a telegram with the
value “0” is sent automatically via the communication object “Fault”.
If “yes” is selected, a telegram is also sent via the communication object
“Fault” via the ABB i-bus
®
EIB after the first occurrence of a fault in the
meter. This error message remains set however until all the faults are
rectified and the error message has been reset via the communication object
“Fault acknowledgement”. The corresponding bits in the status byte object
are also set after the first occurrence of a specific fault and remain set until
the relevant fault is rectified and an acknowledgement telegram has been
received via the communication object “Fault acknowledgement”.
Send status byte on fault:
If the setting “no” is selected, the status byte is
not automatically sent via the ABB i-bus
®
EIB. In order to receive the current
value of the status byte, the object value must be read out by “Value_Read”,
e.g., using the EIB Tool Software ETS.
If “yes” is selected, the status byte is sent after each change via the
communication object “Status byte” via the ABB i-bus
®
EIB, once the
transmission delay T
W
has elapsed (if selected).
Default settings are highlighted
Содержание EIB Delta
Страница 1: ...User Manual ABB i bus EIB EIB Delta Meter Electricity Meters Intelligent Installation Systems ...
Страница 32: ...31 Notes ...
Страница 33: ...32 Notes ...
Страница 34: ...Publication No G SK 09081 01 S0201 Your EIB Partner ...