Section-4
04-3006_S4_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 6/8 ABB
Modifications reserved
4.1.3.6 UPS Data
DESCRIPTION
LCD-DISPLAY
1
These general UPS Data are installed at the
manufacturing plant
UPS SERIAL NUMBER
NW-nnnnn
2
Manufacturing date
DATE OF MANUFACTURE
15-01-2009
3
EPROM Version
EPROM VERSION
V-000
4
Actual Date and Time
DATE
TIME
dd-mm-yyyy
hh:mm:ss
4.1.3.7 Set-Up User
DESCRIPTION
LCD-DISPLAY
1
Set-up Language
(not active yet)
SET LANGUAGE
SET DATE AND TIME
ENGLISH
FRANCAIS
POLISH
2
Set-up Date and Time
SET-UP DATE/TIME
SET-UP BATT. TEST
DD-MM-YY HH-MM-SS
3
Set-up battery test
SET BATTERY TEST
SET GENERATOR OP.
DAY OF MONTH
(1-31)
HOUR OF DAY
(1-24)
REPETITIVE (Y/N)
YES/NO
4
Set-up operation with Gen-Set
SET GENERATOR OP.
NO MORE SETTINGS
BATT.CHARGE LOCK
YES/NO
BYPASS LOCK
YES/NO
4.1.3.8 Set-Up Service
DESCRIPTION
LCD-DISPLAY
1
This Menu is reserved for certified service
engineers. It is not to be used by End-Users
SET-UP SERVICE
PASSWORD
2
Type in password
PASSWORD.
Password is necessary to enter: Service Manual
Содержание DPA Upscale RI Series
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......