background image

 

Installation Instructions 

 

Installation Instructions 

 

Please also refer to chapter 

General instructions

 
 

Transport and Unpacking 

 

The specified storage conditions must be observed (see chapter 

Technical 

data

). 

 

Transport 

 

Despite the robust design of the unit, the components are sensitive to 
strong vibrations and impacts. During transport, your Industrial PC should 
therefore be protected from excessive mechanical stress. Therefore, 
please use the original packaging. 

 

Warning

 

 
Danger of damage to the unit! 
If the device is transported in cold weather or is exposed to extreme 
variations in temperature, make sure that moisture (condensation) does not 
form on or inside the device. 
 
Prior to operation, the unit must be allowed to slowly adjust to room 
temperature. Should condensation occur, a delay time of approximately 12 
hours must be allowed before the unit is switched on. 

 

Unpacking 

 
 

Proceed as follows to unpack the unit: 
 

1. Remove  packaging. 
2. Do not discard the original packaging. Keep it for future relocation. 
3. Check the delivery for completeness by comparing it with your order. 
4. Please keep the associated paperwork. It contains important 

information for handling the unit. 

5. Check the contents for visible shipping damage. 
6. If you notice any shipping damage or inconsistencies between the 

contents and your order, you should notify Beckhoff Service. 

 

 

C6240 

Содержание Control Cabinet PC C0060

Страница 1: ...Installation and Operating instructions for Control Cabinet PC C6240 from 0060 Version 2 0 Date 2018 02 16 ...

Страница 2: ......

Страница 3: ...Transport and Unpacking 9 Transport 9 Unpacking 9 Installation of the PC in the control cabinet 10 Earthing measures 10 Power Supply Connection 11 Current carrying capacity of the 24 V power supply unit 11 Fitting the Power Supply Cable 12 Pin assignment and cable requirements 13 Connecting devices 14 Connecting cables 14 Check voltage rating and connect 14 Operating Instructions 15 Switching the ...

Страница 4: ...Table of contents Technical data 22 Approvals 22 FCC Federal Communications Commission 22 Radio Frequency Interference Statement 22 FCC Canadian Notice 22 2 C6240 ...

Страница 5: ...T TwinSAFE and XFC are registered trademarks of and licensed by Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use by third parties for their own purposes could violate the rights of the owners Patent Pending The EtherCAT Technology is covered including but not limited to the following patent applications and patents EP1590927 EP1789857 DE102004044764 ...

Страница 6: ... whenever the PC is being used for purposes other than plant control such as during functional tests following repair all parts of the equipment must first be switched off after which the Industrial PC can be uncoupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have been switched off must be secured against being switched on again The ...

Страница 7: ...tional regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machines and plant that the operator must observe These regulations cover amongst other things the intervals between inspections of the controller The operator must initiate such inspections in good time Warn...

Страница 8: ...pen the PC housing initially rotate the two fast closing screws see photograph above by 90 degrees in either direction using a screwdriver The inner chassis can now be pulled out on telescopic guide supports see photograph below Removable inner chassis After unlocking the upper housing cover can now be tilted upwards see following photograph thus providing access to the floppy disk drive hard disk...

Страница 9: ...scription View of the open PC Under the housing cover 1 is a 7 slot computer core with standard ATX motherboard 2 and power supply unit 3 The connections are located at the front of the housing 4 1 3 2 4 C6240 7 ...

Страница 10: ...l 6th and 7th generation processors C6240 0070 are equipped with 4 USB3 0 interfaces Network connection LAN1 The RJ 45 connector X112 allows the PC to be connected to a 10 100 1000BASE T Local Area Network LAN LAN2 The RJ 45 connector X113 allows the PC to be connected to a 10 100 1000BASE T Local Area Network LAN Sound On Board Sound The Industrial PC has a on board interface with the following c...

Страница 11: ...ons in temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a delay time of approximately 12 hours must be allowed before the unit is switched on Unpacking Proceed as follows to unpack the unit 1 Remove packaging 2 Do not discard the original packaging Keep i...

Страница 12: ... the PC must be provided The clearance above and below the housing must be at least 50 mm in order to ensure adequate ventilation of the PC Warning Extreme environmental conditions should be avoided as far as possible Protect the PC from dust moisture and heat The ventilation slots of the PC must not be covered Earthing measures Earthing measures Earthing connections dissipate interference from ex...

Страница 13: ...ed conductor 8 to 9 mm Supplied mains power unit The Industrial PCs is either fitted with a 100 240 V 50 60 Hz power supply unit standard or with a 24 VDC power supply unit with the option of an uninterruptible power supply UPS Current carrying capacity of the 100 240 V power supply unit Output voltages from the 100 240 V power supply unit Current loading maximum 3 3 V 16 A 5 V stand by 2 A 5 V 25...

Страница 14: ...f housing in order to assemble the PC power supply cable Materials for assembly of the connector Female plug connector Strain relief housing Female plug connector is correspondingly coded This female plug connector is also coded at the factory according to the type of power supply fitted so that the plug when assembled will fit the Industrial PC s connecting socket A B C D Technical data Female pl...

Страница 15: ...t Pin Function 1 2 24V DC Power supply 3 4 not used 5 not used 5 4 2 3 1 Fitting the connector to the cable The plug is fitted to the cable as follows 1 Strip insulation from the cable ends Follow the technical data for the female plug connector in the above table 2 Push the conductors into their mountings simply by pushing them in as indicated on the pin assignment label 3 Push the lower part par...

Страница 16: ...hat are to be connected Connect all data transfer cables if present to the appropriate plug in receptacles of the data telecommunication networks Reconnect all devices to the power supply Check voltage rating and connect With compact 100 240 VAC 50 60 Hz power supply 1 Check that the mains voltage is correct 2 Insert the power supply cable that you have assembled see the section on Fitting the Pow...

Страница 17: ...k every few seconds so that the probability of causing damage by switching off while the software is running is very high Warning When you have shut down the Industrial PC you have to switch off power supply for at least 10 seconds before rebooting the system After resetting power supply the PC will start booting automatically Reset key A Reset button for rebooting the system is provided on the fr...

Страница 18: ... identical type or an alternative type recommended by the manufacturer Notice correct polarity Handling of Lithium Batteries Danger Lithium Batteries should not be recharged exposed to fire opened and they should be protected against sunlight and moisture The used battery must be disposed of in accordance with national electronics scrap regulations Servicing The Industrial PC requires no maintenan...

Страница 19: ... and press any key Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault is either in the software or in parts of the plant outside the Industrial PC Call the manufacturer of the machine or the software Floppy disk or CD access error Faulty disk or CD Faulty disk drive Check disk or CD in another drive Call Beckhoff ...

Страница 20: ...orstweg 20 D 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Support offers you comprehensive technical assistance helping you no only with the application of individual Beckhoff products but also with other wide ranging services world wide support design programming and commissioning of complex automation systems and extensive training prog...

Страница 21: ...ensions The following pages show diagrams of the Industrial PC with dimensions in mm Warning The assembly of the unit must take place with the orientation diagrammed here Horizontal Installation Front View Side View Top View C6240 19 ...

Страница 22: ...Assembly dimensions Warning The assembly of the unit must take place with the orientation diagrammed here Horizontal Installation With C9900 M630 Front View Side View Top View 20 C6240 ...

Страница 23: ...Assembly dimensions Warning The assembly of the unit must take place with the orientation diagrammed here Vertical Installation Front View Side View Top View C6240 21 ...

Страница 24: ...storage The same values for atmospheric humidity and shock resistance are to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Industrial PC The ambient temperature during storage and transport must be between 20 C and 65 C Approvals FCC Federal Communications Commission Radio Frequency Interference State...

Отзывы: