ABB C310 Скачать руководство пользователя страница 21

19

NOTES

Содержание C310

Страница 1: ...ABB Instrumentation Installation Guide COMMANDER 310 Universal Process Controller COMMANDER 310 A1 A2 L R ST M 47 5 50 0 ...

Страница 2: ...d the possibility of an accident occurring when operating in conditions of high pressure and or temperature 5 Chemicals must be stored away from heat protected from temperature extremes and powders kept dry Normal safe handling procedures must be used 6 When disposing of chemicals ensure that no two chemicals are mixed Safety advice concerning the use of the equipment described in this manual or a...

Страница 3: ...ble Glands IEC 20mm 8 4 4 2 Conduit Adaptors N American 0 5in 8 4 4 3 Cable Glands N American 0 5in 9 4 5 Connections Summary 10 4 6 Input Connections 12 4 6 1 Thermocouple THC Inputs 12 4 6 2 3 lead Resistance Thermometer RTD Inputs 12 4 6 3 2 lead Resistance Thermometer RTD Inputs 12 4 6 4 Links for Unused Inputs 12 4 7 Output Connections 14 4 8 Relay Connections 14 4 9 Motorized Valve Connectio...

Страница 4: ... initial instrument programming and can be retained for future reference 1 INTRODUCTION PROGRAMMING Part No IM C300 PG Basic Config Level Advanced Config Level OPERATION Setting Up Displays Controls Operating Level Simple Fault Finding Part No IM C300 OG Part No IM C310 INS INSTALLATION Product Identification Siting Mounting Electrical Connections Installation Record MODBUS RTU Serial Adaptors Ser...

Страница 5: ... 0 1 3 Standard CSA Approved CL1 DIV 2 CSA FM Configured to Factory Standards Configured to Customers Details Agreed Special Feature STD CUS SPXX XXXX X X XX Option Board Power Supply Build Configuration Special Features Table 2 1 Identification of Instrument Code Number 115V AC versions are fitted with 0 5in NPT gland entry fixings see Section 4 4 2 Code Number Label see Table 2 1 C310 X X X X X ...

Страница 6: ...midity Limits Sensor Minimum A Close to Sensor B At Eye level Location Fig 3 1 General Requirements C Avoid Vibration 55 C Max 0 C Min 0 to 90 RH IP66 NEMA4X Caution Select a location away from strong electrical and magnetic fields If these cannot be avoided particularly in applications where walkie talkies are used connect using screened cables within earthed metal conduit D Use Screened Cables F...

Страница 7: ...72 69 Fixing Centres Allowance for Cable Bends 7 9 200 1 65 42 23 8 61 O D Vertical or Horizontal Post Fixing Holes x3 0 25 6 5 Dia Fig 3 3 Overall Dimensions Fig 3 4 Wall Pipe mounting Details Mark fixing centres see Fig 3 3 1 2 Drill suitable holes 3 Fix instrument to wall using suitable fixing Position U bolts on pipe Position plates over U bolts Secure transmitter to mounting plate Secure plat...

Страница 8: ...he type of Process Variable Input Remote Set Point Input and Valve Position Feedback Inputs used Remove the instrument front panel see Fig 4 1 steps 1 to 6 Referring to Fig 4 2A set the link positions for the input type required 4 3 Setting the Isolated Output Link Fig 4 2B A plug in link PL7 on the microprocessor p c b is positioned according to the isolated output required either a current propo...

Страница 9: ...Input PL2 Remote Set Point Input PL1 Process Variable Input PL2 PL1 1 6 12 7 1 4 8 5 PL1 PL2 1 6 12 7 1 4 8 5 PL1 PL2 1 6 12 7 1 4 8 5 2 wire Transmitter Input 1 6 12 7 PL1 1 2 Identify Link PL7 Set links for output type required mA PL3 1 4 8 5 R mV THC RTD PL3 1 4 8 5 V PL3 1 4 8 5 Analog Output Logic Output or PL7 1 PL7 1 ...

Страница 10: ...ettings for the hubs and outer nuts on the specified adaptors is 20ft lbs minimum 25ft lbs maximum Information Suitable adaptors for controller mandatory for FM installations APPLETON ST 50 PLUS STG 50 or STB 50 PLUS STG 50 Reusable ONLY with replacement ferrule STF 50 O Z GEDNEY 4Q 50 4Q50T or 4Q 50TG Fig 4 4 Conduit Adaptors O Ring Fig 4 3 Cable Gland Supplied as standard Ferrule Outer Nut Seal ...

Страница 11: ...nds mandatory for FM installations O Z GEDNEY SR 50 375 or SR 504 APPLETON CG 3150 or CG 3150S and STG 50 sealing ring THOMAS BETTS 2521 When fitting cable glands to the controller start with an outer gland and also temporarily fit a gland at the opposite end to aid location of the transmitter gland plate Fit and tighten glands consecutively from initial gland Fittings vary slightly for different ...

Страница 12: ...dances Low voltage mV 10MΩ Voltage 10MΩ Current 10Ω 3 4 5 6 7 8 9 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 10 11 12 13 14 15 1 2 16 17 Power Supply Relay 1 Relay 2 Relay 3 MODBUS RTU if option fitted Retransmission Output Position Feedback Input Process Variable Input Remote Set Point Input Logic Input Control Output ...

Страница 13: ...d 4 14 Remote Set Point Input see Figs 4 7 to 4 12 and 4 14 Relay 1 Output Motorized Valve Control Relay open see Fig 4 17 see Fig 4 19A Relay 2 Output Motorized Valve Control Relay close see Fig 4 17 see Fig 4 19A Relay 3 Output see Fig 4 17 AC Supply L N see Fig 4 22 Alarm Relays Position Feedback Input see Figs 4 18 4 19A and 4 19B Logic Input 1 see Figs 4 20 and 4 21 Logic Input 2 see Figs 4 2...

Страница 14: ...tibility to electro magnetic interference ensure that the three terminals on each unused input are shorted together with sleeved wire links 4 ELECTRICAL INSTALLATION f o e p y T e l p u o c o m r e h T e l b a C g n i t a s n e p m o C 3 4 8 1 S B I S N A 1 6 9 C M N I D 4 1 7 3 4 7 3 9 4 S B 0 3 o N t r a P K l A i N r C i N n w o r B e u l B d e R e s a C w o l l e Y d e R w o l l e Y e s a C d ...

Страница 15: ...ter Power Supply Input Connections Fig 4 12 Current Input Connections Fig 4 14 Voltage Input Connections Fig 4 15 Current Proportioning Control and Retransmission Output Connections Fig 4 16 Logic Control Output Connections 4 ELECTRICAL INSTALLATION Sleeved Link Remote Set Point Process Variable Process Variable Remote Set Point Red Red White Process Variable Remote Set Point Sleeved Link Tx Proce...

Страница 16: ...ve Valve Positioner Power Supply 0 100 5 6 3 4 100 Link 0 29 27 28 0 100 Motorized Valve Drive 27 29 28 Link Fig 4 19 Motorized Valve Connections using feedback slidewire 4 9 Motorized Valve Connections Figs 4 18 and 4 19 4 3 7 6 0 9 5 8 Relay 3 Relay 2 Relay 1 Normally Closed Common Normally Open Fig 4 17 Relay Connections 29 27 28 Motorized Valve Drive Sleeved Link Fig 4 18 Motorized Valve Feedb...

Страница 17: ... 4 20 and 4 21 Each logic input can be programmed to perform one of a number of functions see Section 3 10 of the Programming Guide Fig 4 21 Additional Logic Input Functions for Profile Selection Fig 4 20 Standard Logic Input Functions Start Profile Hold Soak Start Profile Profile Reset Hold Soak Profile Reset Skip Segment Leading edge triggered minimum duration 200ms 5V 0V Logic switching Skip Cu...

Страница 18: ...on and AC Connections 4 ELECTRICAL INSTALLATION Information Fuse Rating 5A Type T 115 Selector not Fitted 24V AC Code Label Digit 7 3 2 1 C31 x x xx x x x x x 115 230 Remove plug to make connection A Selecting the Supply Voltage B Power Supply Connections Line Neutral Ground 230V 115V Fuse ...

Страница 19: ...t Relay 2 Output Power Supply Tick Box 230V AC 115V AC 24V AC Output Type Output Function Output Type Output Function Relay 3 Output Output Type Output Function Tick Box Link Positions mA V mV THC RTD 2 wire Tx Process Variable Input V mA mV THC RTD Tick Box Link Positions Remote Set Point Input Modbus Serial Communications Option 1 only Tick Box Termination Resistors Linked out Linked in Output T...

Страница 20: ...RECORD 25 26 27 28 29 30 31 32 3rd Connection Termina Number Control Output Position Feedback Input Common Tick Box Link Positions Analog Output Logic Output Logic Input 1 Logic Input 2 V mA mV Tick Box Link Positions R ...

Страница 21: ...19 NOTES ...

Страница 22: ...20 NOTES ...

Страница 23: ...rs and Field Indicators Flow Metering Magnetic Flowmeters Electromagnetic insertion type probes and watermeters Turbine Flowmeters Wedge Flow Elements Mass Flow Meters Transmitters sensors controllers and batch display units Level Control Submersible Capacitance Conductivity Pneumatic Instrumentation Transmitters Indicating Controllers Recording Controllers Customer Support ABB Instrumentation pro...

Страница 24: ...ithout notice ABB 2000 Printed in UK 01 00 ABB Instrumentation Ltd St Neots Cambs England PE19 3EU Tel 44 0 1480 475321 Fax 44 0 1480 217948 ABB Automation Inc Instrumentation Division 125 E County Line Road Warminster PA 18974 USA Tel 1 215 674 6000 Fax 1 215 674 7183 ABB Instrumentation SpA 22016 Lenno Como Italy Tel 39 0 344 58111 Fax 39 0 344 58278 ...

Отзывы: