C1300
Advanced circular chart recorder
1 Preparation
4
IM/C1300 Rev. J
1.2 Powering up the Recorder
To power up the recorder:
1. Switch on the supply to the recorder, any power-operated control circuits and the input signals. Wait for the pens to settle.
2. The start-up self-test sequence shown in Fig. 1.3 is shown on display screen 1 when the power supply is first switched on.
Fig. 1.3 Recorder Start-up Self-test Sequence
WWW.abb.com
Self Tests, Software Key and
Module Identification
Instrument Type and Software Version
C1314J
Software Issue
1
Main: CFG Test :Pass
SKey:Type B :Pass
Mod2:Not Fitted
Mod3:Not Fitted
Mod4:Not Fitted
Mod5:Not Fitted
Mod6:Not Fitted