![ABB Battery cabinet for PowerValue 11-31T 10-20 kVA Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/abb/battery-cabinet-for-powervalue-11-31t-10-20-kva/battery-cabinet-for-powervalue-11-31t-10-20-kva_user-manual_2038006.webp)
Modifications reserved
Page 6/12
2
Installation
WARNING!
−
PARALLEL BATTERY CABINETS OR UPS INTERNAL BATTERIES MAY
PRESENT VOLTAGE AT TERMINALS OF A BATTERY CABINET UNDER
SERVICE. MAKE CERTAIN ALL POLES OF THE BATTERY CABINET
DISCONNECT DEVICE ARE OPEN BEFORE UNDERTAKING INTERNAL
SERVICE ACTIVITY.
−
MAKE CERTAIN ALL DISCONNECT DEVICES OF INSTALLED
BATTERIES ARE OPEN BEFORE CONNECTING OR DISCONNECTING
AN ADDITIONAL BATTERY CABINET TO BATTERY VOLTAGE BUS’.
For a correct installation and cabling of the battery cabinet, please follow step by step the instructions
described below:
1.
Remove the two side and upper panel covers from the unit. (fig. 1)
2.
Remove the 4 metallic bars (2 per side) that are locking the plastic battery trays. (fig. 2)
Fig. 1
Fig. 2