ABB AutoLink Скачать руководство пользователя страница 5

TEHI95094 – rev. 1 

5 / 11

 

 

The accompanying documents inserted in the shipping packing are: 

-  Test Certification 

-  Packing List 

Other documents which are sent prior to shipment of the apparatus are: 

-  Order confirmation 

-  Original shipping advice notes 

-  Any drawings or documents referring to special configurations/conditions 

4  Storage 

When a period of storage is foreseen, our workshops can (on request) provide suitable 
packing for the specific storage conditions. 

On receipt the apparatus must be carefully unpacked and checked as described in 
Chapter 2 of this manual. 

If immediate installation is not possible, the packing must be replaced, using the original 
material supplied. 

Should the original packing not be available and immediate installation is not possible, 
store in a covered, well-ventilated, dry, dust-free, non-corrosive ambient, away from any 
flammable materials and at a temperature between -5°C and +45°C. 

In any case, avoid any accidental impacts or positioning which stresses the structure of 
the apparatus. 

5  Description 

The AutoLink Electronic Sectionalizer is a protective device that operates at a permanent 
failure in the distribution line. It must be used together with a backup recloser. Please 
take note that the AutoLink is not a fuse tripping device, therefore it cannot be used as a 
protective device by itself. 

The AutoLink Electronic Sectionalizer is designed ONLY to protect electrical equipment 
and NOT for saving people from accidents or electrocution when contacting energized 
circuits. 

6  Installation 

6.1  General 

Correct installation is of primary importance. The manufacturer’s instructions must 

be carefully studied and followed. It is good practice to use gloves for handling the 
pieces during installation. 

6.2  Installation and service conditions 

The following standards must be taken into particular consideration during installation and 
service: 

Содержание AutoLink

Страница 1: ...TEHI95094 rev 1 AutoLink 15kV 27kV 33kV Mounting Instructions...

Страница 2: ...tice and safety in the workplace are constructed Strictly follow the information given in this instruction manual Check that the rated performance of the apparatus is not exceeded during service Check...

Страница 3: ...3 Checking on Reception 4 4 Storage 5 5 Description 5 6 Installation 5 6 1 General 5 6 2 Installation and service conditions 5 6 3 Initial Setting or Previous Setting Modification Instructions 6 6 4...

Страница 4: ...into service commissioning and maintenance operations must be carried out by suitably qualified personnel with in depth knowledge of the apparatus 2 Packing and Transportation The AutoLink Sectionaliz...

Страница 5: ...rom any flammable materials and at a temperature between 5 C and 45 C In any case avoid any accidental impacts or positioning which stresses the structure of the apparatus 5 Description The AutoLink E...

Страница 6: ...g Modification Instructions Remove the contact cap Fig 1 A with a 34mm fork spanner holding the base Fig 1 B with the hand Check condition of O ring Fig 2 E and replace if necessary applying grease on...

Страница 7: ...nt and counts are selected cover the dipswitch with a generous amount of silicon grease Fig 3 supplied with AutoLink Figure 3 Check the condition of the O Ring Fig 2 E and apply silicon grease Fig 4 F...

Страница 8: ...0 Nm without damaging the O Ring Fig 5 Figure 5 6 4 AutoLink Repositioning Push the interlocking bolt Fig 6 until blocked it will spin freely but it will not reset Do not strike the bolt nor use any t...

Страница 9: ...until it is firmly blocked Fig 8 Figure 8 Place the pole in the tube inferior eyelet Fig 9 and position in the isolating support body Figure 9 Withdraw the pole and place it in the tube s superior ey...

Страница 10: ...regular basis preferably while maintenance on head recloser is made Check the closing system Check that the interlocking bolt turns freely The tensioning device support should move easily and the spr...

Страница 11: ...TEHI95094 rev 1 11 11 Copyright 2007 ABB All rights reserved Document Title AutoLink Document No Date Rev Ind No of Pages Page TEHI95094 EN 1 11 11...

Отзывы: