T EC H N I C A L  A N D  A P P L I C AT I O N  G U I D E

15

If the customer does not own the MV line con-
nected to their transformer or the local utility does 
not want additional products added on their MV 
service line to the customer’s site, we can apply 
ABB’s ArcLimiter solution to the LV transformer 
side with the same arc flash mitigation effective-
ness and possibly lower installed costs.  This ap-
proach should also improve MV power quality 
during an AF event.  

Note that in Figure 11, the CLF is now relocated 
from the MV side to the LV side of the transformer.  
These LV CLFs are not as long, but much wider, so 
changes in mechanical installation must be consid-
ered.  Connect the CLF directly to the transformer’s 
secondary LV bushings.  The CLF’s load terminals 
should connect to the LV busduct or main load ca-
bles routed to the LV switchgear.  The PSEs should 
be connected from the CLF’s load terminals to 
ground.  The QRU100 controller can be mounted in 
the LV switchgear or the transformer’s secondary 
air terminal.  As in the previous applications, the 
REA101 needs to have communications to the 
QRU100.  This approach will have less negative im-
pact at the MV level.  

LV fault magnitude

Once the PSEs close, the transformer and CLF will 
see a bolted LV fault collapsing any LV equipment 

AF.  That transformer LV through-fault of 52kA will 
be reflected to the MV primary as (1 / %Z) * FLA.  
Example: 80% of the MV-LV transformers are 
2500KVA base rated.  Per ANSI, energizing the 
transformer will produce an inrush of 12*FLA for 
0.1s.  If the transformer has an impedance of 5.75% 
or 9%, the inrush will be (1 / 0.0575)*FLA = 
17.4*FLA.  Slightly higher than typical inrush.  For 
the 9%Z version, the inrush will be (1 / 0.09)*FLA = 
11.1*FLA.  Slightly lower than typical inrush.  

Through-fault duration

A 2500KVA transformer has a top rating typically at 
3333KVA (3990FLA at 480V).  Therefore, a 4000A 
(or 5000A) class L CLF needs to be applied.  If a 
Mersen A4BQ 4000A (or 5000A) is applied, that 
through-fault will last 0.029s or 1.7 cycles (0.148s or 
8.9 cycles).  The reflected through-fault could be 
higher than typical inrush but may last for less time 
duration.  The mix of transformer KVA vs. CLF sizes 
vs. CLF response time is not that large.  Each appli-
cation will have to be evaluated and the area FAE(s) 
can help here.  

Grounding

Similar to the MV applications, most LV applica-
tions for industrial plants have high Z (5A limited) 
grounded systems.  Upon PSE closure, two of the 
CLFs will open, the third CLF will be damaged but 
stays intact.  The ground alarm will activate.

ArcLimiter

TM

 solution application at 

LV system level


11 MV system is not 
solidly grounded, 
but low resistance 
neutral grounded


11

Содержание ArcLimiter

Страница 1: ... TECHNICAL AND APPLICATION GUIDE ArcLimiterTM Arc flash mitigation solution for low voltage equipment using UFES ultra fast earthing switch ...

Страница 2: ...stries are facing internal or external deadlines to implement arc flash AF mitigation solutions within their facilities ABB now offers ArcLimiterTM an arc flash mitigation solution that is unique in the industry It solves the LV arc flash problem at the MV or LV system level ...

Страница 3: ... 007 008 Low resistance grounded MV systems 009 010 High resistance grounded MV systems 011 012 Ungrounded Delta MV systems 013 Summary of ArcLimiterTM solution application scenarios 014 MV LV transformers fed by MV breaker 015 ArcLimiterTM solution application at LV system level 016 Available UFES ratings ...

Страница 4: ...ltage on the transformer primary extinguishing the LV arc flash quickly approximately 4 ms Test results in dicate the incident energy level peak was 0 5 cal cm2 which is well below the AF threshold of 1 2 cal cm2 where PPE is required A note on the CLF application is in order A fuse will become current limiting when the magnitude of amperes through it is large enough to fully in terrupt in cycle o...

Страница 5: ...150E ratio of the SCC to the fuse FLA rating is 67 Fuse will inter rupt in cycle Operations should not be im pacted System SCC 4 600A CLF is a 200E ratio is 23 Fuse will interrupt in cycles Operations could be impacted and the plant needs to be informed up front 01 Internal distribution system configuration Post testing analysis revealed that MV system grounding has an impact on overall system beh...

Страница 6: ...ions When phases A and B CLF fully interrupt the entire phase C current briefly appears as a zero sequence current on the traces The only path for fault current is through the phase C fuse to UFES phase C PSE to transformer grounded neutral Since there is no impedance in that path the fault current flow is high only limited by the transformer s short circuit impedance Since phase C is delayed by 1...

Страница 7: ...oltage recovery starts with full CLF interrup tion by 1 5 2 ms SCC dependent When phase A and B CLF clear the entire phase C current appears as a zero sequence current on the test traces There is a large reduction in phase C fault current once phases A and B CLF open The only path for fault current is through the phase C fuse to UFES phase C PSE to the transformer s neutral but is now limited by t...

Страница 8: ...protection relay x seconds later Review the ground return path in Figure 4 This action shuts down the entire MV BUS resulting in poor reliability for customers plants The 51G 1 or 51G 2 will be faster than a sustained high ground fault value say 1200 A through the CLF To prevent this reliability issue the MV SWITCH should be installed or retrofitted with a shunt trip activated by one of the QRU1 s...

Страница 9: ...nues as a plant benefit The UFES closes all three phases to ground simulta neously At this point the LV AF is essentially over Depending upon UFES closing time and phase se quence phase A and B CLF melt in 1 ms MV voltage system recovery starts with full CLF interruption by 1 5 2 ms SCC dependent When phases A and B CLF clear the entire phase C current now very lim ited appears as a zero sequence ...

Страница 10: ...n micro seconds However having a sustained bolted line to ground phase C 10 A fault will activate the plant s ground fault alarm system Maintenance would be chasing the wrong problem To prevent this nuisance alarm the MV SWITCH should be installed or retrofitted with a shunt trip activated by one of the QRU1 s trip out contacts Two of the CLFs will still interrupt in about the same timeframe about...

Страница 11: ...o not have ground fault protection Indications of a ground fault are usually via installed voltmeters The operating process continues as a plant benefit When triggered the UFES closes all three phases to ground simultaneously At this point the LV AF is essentially over Depending upon the UFES closing time and phase sequence phase A and B fuses melt in 1 ms MV voltage recovery starts with full CLF ...

Страница 12: ...will activate the plant s ground fault alarm system Maintenance would be chasing the wrong problem To prevent this nuisance alarm the MV SWITCH should be installed or retrofitted with a shunt trip activated by one of the QRU1 s trip out contacts Two of the CLFs will still interrupt in about the same timeframe about 1 2 ms Phase C CLF may not in terrupt This prevents the false alarms Upon UFES oper...

Страница 13: ... C CLF interruption is delayed almost indefinitely Too short a time for ground relay pick up Sustained line to ground phase C fault tripped by the upstream 51G relay Trips entire MV BUS resulting in poor reliability for the plant Sustained line to ground phase C 10 amp fault activates the plant s ground fault alarm system Sustained line to ground phase C fault will activate the plant s ground faul...

Страница 14: ...ary windings The X axis is in units of times transformer s full load amps base not top The Y axis in seconds is the time duration capability of the transformer to thermally and mechanically withstand a sustained secondary bolted fault The lower portion of the curve is the mechanical damage area considered the area of most concern from a protection viewpoint The graph s purpose is to assist in the ...

Страница 15: ...l see a bolted LV fault collapsing any LV equipment AF That transformer LV through fault of 52kA will be reflected to the MV primary as 1 Z FLA Example 80 of the MV LV transformers are 2500KVA base rated Per ANSI energizing the transformer will produce an inrush of 12 FLA for 0 1s If the transformer has an impedance of 5 75 or 9 the inrush will be 1 0 0575 FLA 17 4 FLA Slightly higher than typical...

Страница 16: ...d voltage peak kV 12 95 150 170 Rated frequency Hz 50 60 50 60 50 60 50 60 Rated short time withstand current kA 100 50 63 40 40 Rated peak withstand current kA 220 130 165 104 104 Rated duration of short circuit s 0 5 3 2 3 3 Rated short curcuit making current kA 220 130 165 104 104 Mechanical properties Dimension diameter x height mm in 137 x 210 5 4 x 8 3 Closing time ms 1 5 Contact bounce time...

Страница 17: ...formation up to date and correct it makes no representations or warranties of any kind express or implied about the completeness accuracy reliability suitability or availability with respect to the information products services or related graphics contained in the document for any purpose Any reli ance placed on such information is therefore strictly at your own risk ABB reserves the right to disc...

Отзывы: