![ABB AquaMaster Explorer Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/abb/aquamaster-explorer/aquamaster-explorer_instruction-manual_4330027.webp)
Electromagnetic Flowmeter
AquaMaster™ Explorer
4 Start-Up And Operation
IM/AM/E
Issue 10
25
4.2 Start-up
Remove any plastic film from the AquaMaster light sensitive display window before commencing normal
operation.
When electrical power is connected, or the plastic film is removed from the display window with electrical
power connected, the AquaMaster performs a self-test operation. If successful, 'Pass' is indicated in the
display window.
If the display shows 'Err 1', check the sensor wiring. If the fault is rectified, the transmitter restarts
automatically.
If the display shows 'Err 2 or 3', contact ABB.
4.3 Display Activation
For normal operation, activate the light sensitive display by first covering the display area totally.
On removing the covering, the display activates and cycles through the programmed set of display
measurements.
Fig. 4.3 Location of Controls
Note.
For the use of local or remote serial communication and how to alter the displayed set of
measurements, or instrument setup, see the Quick Reference Programming Guide.
Lower Display
Time
Flow Velocity
Pressure
Left Battery Warning
Sensor Fault
Empty Pipe condition
Mains Failure
Right Battery Warning
Upper Display
Date
Forward Flow Total
Reverse Flow Total
Net Flow Total
Pictorial Displays
Warning Annunciators