Appendix 1 Installation check list
Installation date
Motor serial number
YES
NA
General
Has the manual been read and understood?
□
Has the motor been stored according to what is described in the manual?
□
Are suitable and correct personal safety equipment available?
□
Are appropriate lifting eye bolts available?
□
Mechanical installation
Are the concentricity and perpendicular tolerances for the mating shaft and flange fulfilled?
□
□
Are the requirements for the mating surfaces for side support mounting fulfilled?
□
□
Have all bolts been tightened with the correct tighten torque?
□
□
Has thread locking been applied to the bolts?
□
□
Has the spline been lubricated with a suitable molybdenum disulfide grease?
□
□
Liquid cooling system installation
Are recommended mating cooling connectors used?
□
□
Is a recommended coolant used?
□
□
Are the requirements of the liquid cooling system according to the separate rating plate fulfilled?
□
□
Electrical installation
Is the mating HV power connector the correct type?
□
□
Is the motor properly grounded?
□
□
Are all cable connections installed in an appropriate way and suitable for high frequency currents?
□
□
Is the mating LV connector the correct type?
□
□