background image

Installation, Operations and Maintenance Manual 

 

1VAL064601-MB  Rev C 

 

 
 
 

10 

 

 

Figure 17: Lower terminal configuration in 

disconnected position with ground bus 

installed 

 

Figure 18: Upper terminal configuration in 

disconnected position with ground bus 

installed 

12.  With the ground bar attached, close and secure 

the switchgear breaker compartment door and 
rack the device into the “connect” position. 

13.  With  the  ground  bar  installed  and  the  device 

racked into the “connect” position, the terminal 
set is connected to the switchgear ground bus. 

 

 

 

4.2

 

Removing Ground/Withdrawing the Device 

1.  Rack the device to the disconnected position. 

2.  Open  the  switchgear  breaker  compartment 

door, disconnect and remove the ground bar. 

 

4.3 Testing 

Prior to each use, the following tests should be completed 
to assure the G&T device is in good condition. 

4.3.1 AC Withstand Voltage Test 

1.  For  each  terminal,  complete  the  following  test 

sequence: 

a.  Connect the high potential lead to one 

pole. 

b.  Ground  the  remaining  poles  and  G&T 

device frame. 

c.  Start machine with output potential at 0 

(zero) Vac/Vdc. 

d.  Increase the potential to 27 kVac RMS.  

If using DC, the test potential should be 
38 kVdc. 

e.  Hold for one minute. 

f. 

Decrease  the  potential  to  0  (zero) 
Vac/Vdc and turn off the maching. 

2.  Repeat this testing for the remaining terminals. 

A  successful  withstand  indicates  satisfactory 
insulation strength of the primary circuit. 

4.3.2 Current Path Resistance 

1.  Connect the  ground bar for the terminal set to 

be used (upper or lower). 

2.  Connect one lead from the test set to the ground 

on the bottom of the G&T device. 

3.  Connect the other lead from the test set to the 

primary contact of the G&T device terminal set 
to be tested. 

4.  Measure  the  end-to-end  grounding  path 

resistance  through  the  primary  disconnect, 
grounding  cable,  and  ground  shoes  using  a 
digital low resistance ohmmeter (DLRO). 

The  measured  resistance  should  not  exceed  100 
micro-ohms. 

 

 

Courtesy of NationalSwitchgear.com

Содержание Advance

Страница 1: ...ABB 15 kV 63 kA Manual Ground Test Device Instruction Manual 5 15 27 kV 25 31 5 50 63 kA Manual Ground Test Devices Installation Operations and Maintenance Manual Courtesy of NationalSwitchgear com...

Страница 2: ...3 3 Testing 7 3 3 1 AC Withstand Voltage Test 7 3 3 2 Current Path Resistance 7 4 Usage and Operation for ReliaGear ND G T Devices 8 4 1 Grounding 8 4 2 Removing Ground Withdrawing the Device 10 4 3...

Страница 3: ...aintaining this equipment must have thorough knowledge of all applicable local regional industry government and OSHA safety procedures as well as commonly accepted safe working practices Personnel wor...

Страница 4: ...uld not under any circumstances be applied outside of their nameplate ratings This booklet provides information for the Manual G T Device with ratings shown in Table 1 All information in this booklet...

Страница 5: ...he device Lifting provisions are provided Once removed from the shipping container the G T may be transported using the lift truck This is the preferred transport method 2 2 3 Storage Store all equipm...

Страница 6: ...relevant to the switchgear found below a SafeGear HD Installation Operations and Maintenance Manual document number 1VAL108001 MB Section 5 11 1 b Advance Installation and Maintenance Manual document...

Страница 7: ...tion Operations and Maintenance Manual document number 1VAL108001 MB Section 5 11 1 b Advance Installation and Maintenance Manual document number IB3 2 6 7A Chapter 8 c SafeGear Installation and Maint...

Страница 8: ...ed close and secure the switchgear breaker compartment door and rack the device into the connect position 12 With the ground cables installed and the device racked into the connect position the termin...

Страница 9: ...to 45 kVac RMS or 45 kVdc if performing a DC test e Hold for one minute f Decrease potential to 0 zero Vac Vdc and turn off machine 3 Repeat this testing for the remaining terminals A successful withs...

Страница 10: ...bus installed 4 Ensure proper procedures are followed for removing the breaker and opening the switchgear door 5 Insert the device in the switchgear breaker compartment using ReliaGear ND Installatio...

Страница 11: ...closed 8 Open the switchgear breaker compartment door 9 Test the exposed terminal ends to assure there is no voltage present on the terminal set to be grounded Figure 15 Lower terminal configuration...

Страница 12: ...rminal complete the following test sequence a Connect the high potential lead to one pole b Ground the remaining poles and G T device frame c Start machine with output potential at 0 zero Vac Vdc d In...

Страница 13: ...l the hardware and torque to 10Nm 8 Ft Lbs 5 Maintenance After removal from storage the following pre usage inspection and maintenance should be performed The contacts should be inspected for wear of...

Страница 14: ...2RGA018908A0001 3 Pieces Required 14522G00 3 Pieces Required N A Upper Primary Disconnect 3000A 2RGA018908A0002 3 Pieces Required 14544G00 3 Pieces Required N A Lower Primary Disconnect 1200 2000A 2R...

Страница 15: ...Installation Operations and Maintenance Manual 1VAL064601 MB Rev C 13 Appendix 5 15 kV 63 kA Manual G T SafeGear HD Layout Drawing Note dimensions in mm in Courtesy of NationalSwitchgear com...

Страница 16: ...Installation Operations and Maintenance Manual 1VAL064601 MB Rev C 14 27 kV 1200 2000 A 25 kA Manual G T Layout Drawing Note dimensions in mm in Courtesy of NationalSwitchgear com...

Страница 17: ...Installation Operations and Maintenance Manual 1VAL064601 MB Rev C 15 5 15 kV 50 kA Manual G T Layout Drawing Note dimensions in mm Courtesy of NationalSwitchgear com...

Страница 18: ...Installation Operations and Maintenance Manual 1VAL064601 MB Rev C 16 5 15 kV 31 5 kA ReliaGear ND Manual G T Layout Drawing Courtesy of NationalSwitchgear com...

Страница 19: ...e time of disposal Methods of Disposal Disposal can either be carried out in a manner of ways depending upon material of product Below is the recommended method of disposal for various raw material AB...

Страница 20: ...l inclusive or covering all contingencies No warranties expressed or implied including warranties of fitness for a particular purpose or merchantability or warranties of fitness for a particular purpo...

Страница 21: ...Installation Operations and Maintenance Manual 1VAL064601 MB Rev C 19 Notes Courtesy of NationalSwitchgear com...

Страница 22: ...tion contained in this document is for general information purposes only While ABB strives to keep the information up to date and correct it makes no representations or warranties of any kind express...

Отзывы: