Installation checklist 77
7
Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine
converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go
through the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described
below. Do the tasks described in the safety instructions of the converter. If you
ignore them, injury or death, or damage to the equipment can occur.
1. Open the main disconnector of the converter and lock it to open position.
2. Ensure by measuring that the converter is not powered.
Содержание ACS880-87LC-4000A/4021A-7
Страница 4: ......
Страница 10: ...10 ...
Страница 17: ...Safety instructions 17 1 3 2 4 5 6 7 ...
Страница 18: ...18 Safety instructions 8 9 ...
Страница 28: ...28 Introduction to the manual ...
Страница 52: ...52 Mechanical installation ...
Страница 66: ...66 Planning the electrical installation ...
Страница 74: ...74 Electrical installation Diagrams for the customer connections are presented below ...
Страница 75: ...Electrical installation 75 optional Fast shutdown ...
Страница 85: ...Maintenance 85 b c a Air flow direction 2 3 4 6 ...
Страница 87: ...Maintenance 87 2 5 4 ...
Страница 88: ...88 Maintenance 7 Arrow indicating the air flow direction 5 6 6 ...
Страница 90: ...90 Maintenance Air flow circulation b a ...
Страница 106: ...106 Maintenance ...
Страница 124: ...124 Control units of the converter ...
Страница 126: ...126 Dimension drawings ...
Страница 127: ...Dimension drawings 127 ...
Страница 128: ...128 Dimension drawings ...
Страница 142: ...142 Cooling and heating ...