96 Control units of the drive
Control unit layout and connections
Description
I/O
I/O terminals (see following diagram)
SLOT 1
I/O extension, encoder interface or
fieldbus adapter module connection.
(This is the sole location for an FDPI-02
diagnostics and panel interface.)
SLOT 2
I/O extension, encoder interface or
fieldbus adapter module connection
SLOT 3
I/O extension, encoder interface, fieldbus
adapter or FSO-xx safety functions
module connection
SLOT 4
RDCO-0x DDCS communication option
module connection
X205
Memory unit connection
BATTERY
Holder for real-time clock battery
(CR 2032)
AI1
Mode selector for analog input AI1
(I = current, U = voltage)
AI2
Mode selector for analog input AI2
(I = current, U = voltage)
D2D TERM Termination switch for drive-to-drive link
(D2D)
DICOM=
DIOGND
Ground selection. Determines whether
DICOM is separated from DIOGND (ie.
the common reference for the digital
inputs floats).
7-segment display
Multicharacter indications are displayed as repeated
sequences of characters
(“U” is indicated briefly before “o”.)
Control program startup in progress
(Flashing) Firmware cannot be started.
Memory unit missing or corrupted
Firmware download from PC to control
unit in progress
At power-up, the display may show short
indications of eg. “1”, “2”, “b” or “U”.
These are normal indications immediately
after power-up. If the display ends up
showing any other value than those
described, it indicates a hardware failure.
Содержание ACS880-07XT Series
Страница 1: ...ABB industrial drives Hardware manual ACS880 07XT drives 400 to 1200 kW ...
Страница 4: ......
Страница 12: ...12 ...
Страница 20: ...20 Safety instructions ...
Страница 26: ...26 Introduction to the manual ...
Страница 47: ...Mechanical installation 47 Moving the crate with a forklift Free width for fork tines 750 mm 29 5 ...
Страница 54: ...54 Mechanical installation ...
Страница 89: ...Electrical installation 89 PE 11 8 4 9 11 ...
Страница 94: ...94 Electrical installation ...
Страница 110: ...110 Start up Test and validate the operation of Prevention of unexpected start with FSO xx option Q950 Action ...
Страница 112: ...112 Fault tracing ...
Страница 123: ...Maintenance 123 5 6 7 ...
Страница 124: ...124 Maintenance 8 10 9 ...
Страница 126: ...126 Maintenance 6 5 4 ...
Страница 127: ...Maintenance 127 9 8 7 ...
Страница 128: ...128 Maintenance 12 11 10 ...
Страница 149: ...Dimensions 149 Dimension drawing examples Frame 2 R11 R10 with brake chopper ...
Страница 150: ...150 Dimensions Frame 2 R11 R10 without brake chopper ...
Страница 153: ...Dimensions 153 Location of input terminals ACS880 07XT 12 pulse ...
Страница 154: ...154 Dimensions Location of output terminals ACS880 07XT R10 with du dt ...
Страница 155: ...Dimensions 155 Location of output terminals ACS880 07XT R10 without du dt ...
Страница 156: ...156 Dimensions Location of output terminals ACS880 07XT R11 with du dt ...
Страница 157: ...Dimensions 157 Location of output terminals ACS880 07XT R11 without du dt ...
Страница 158: ...158 Dimensions Location of PE terminals ACS880 07XT ...
Страница 159: ...Dimensions 159 Location of resistor terminals ACS880 07XT R10 ...
Страница 160: ...160 Dimensions Location of resistor terminals ACS880 07XT R11 ...
Страница 168: ...www abb com drives www abb com drivespartners 3ABD00043579 Rev C EN 2018 01 01 Contact us ...