74 Start-up with medium voltage stator
Start in local control mode
It is useful to record important signals with the DriveWindow PC tool when the wind turbine
converter is connected to the grid. The figure below represents a typical start in local
mode.
1. Grid-side converter is started and DC link charging begins. DC link voltage starts to
increase and auxiliary power is connected to the rotor-side converter. After these
actions, the converter signals can be monitored.
2. Grid-side converter charging is finished. Modulation of both converters starts. Stator
voltage increases near to the measured grid voltage.
3. DC voltage increases to its maximum if the rotor speed is near the lowest possible
start speed.
4. The converter software adjusts the stator voltage in order to minimise current
transients during grid connection.
5. Main circuit breaker is closed.
-200
0
200
400
600
800
1000
1200
1400
0
1
2
3
4
5
6
7
8
9
10
1.01 MOTOR SPEED [rpm]
1.10 DC VOLTAGE [V]
1.11 MAINS VOLTAGE [V]
2.02 STATOR VOLTAGE [V]
2.06 ROTOR IR (RMS) [A]
2.01 STATOR IS (RMS) [A]
Содержание ACS800-67
Страница 1: ...ABB wind turbine converters System description and start up guide ACS800 67 wind turbine converters ...
Страница 4: ......
Страница 76: ...76 Start up with medium voltage stator ...
Страница 99: ...Practical examples 99 1 4 4 3 2 5 6 7 ...
Страница 106: ...106 Practical examples Counterclockwise rotation at drive end D end Power cabinet Encoder ...
Страница 118: ...118 Tracing the source of warnings limits and faults ...
Страница 120: ...Contact us www abb com windconverters 3AUA0000095094 Rev B EN 2017 12 31 ...