![ABB ACS580MV Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342061.webp)
Mechanical installation 61
Cabinet roof
The cabinet roof is not designed as a mounting base for foreign devices, cable ducts and
so on. Therefore, it is not permitted to install any foreign device on the roof.
Installing fan units
AC fans are already mounted when delivered from works.
EC fans need to be installed with fan box in the field.
For information on the number of fan units to be installed, see
.
Installation
1. Lift the fan unit onto the cabinet roof by means of a forklift or a crane (if using a crane,
empty the lifting eyes in the fan roof).
•
~70 kg for EC500 fan units
•
~90 kg for EC560 fan units
2. Use the supplied screws to fasten the fan units to the cabinet roof.
For information on the electrical installation, see
Control and power supply cables for fan
NOTICE
The mounting position can be identified by the cutouts in the drive roof.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...