Guidelines for planning the electrical installation 51
5
Guidelines for planning the
electrical installation
References
For instructions for planning the electrical installation of the drive and for the technical
requirements for the protection and control of the medium voltage supply see the
ACS580MV Engineering Guideline
.
For selecting a specific drive type and options refer to
ACS580MV Engineering Guideline
.
Limitation of liability
The installation must always be designed and made according to applicable local laws and
regulations. ABB does not assume any liability whatsoever for any installation which
breaches the local laws and/or other regulations. Furthermore, if the recommendations
given by ABB are not followed, the drive may experience problems that the warranty does
not cover.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...