8

WIRING SCHEMATICS

INSTALLATION

USING VFD PRESETS FOR THE SPEED SIGNALS

The VFD can be programmed with 3 pre-set speeds. Contact switches can then be used to direct the VFD 
to operate at one of those speeds. See ABB manuals for additional options. Leader-follower wiring can also 
be used to make a second VFD operate at the same speed as the fi rst VFD.

F6

USE OF 2 SWITCHES TO COMMAND THE VFD 

TO OPERATE AT ANY OF 3 PRE-SET SPEEDS.

NOTE: 

Pre-set speeds override any 

Frequency (Speed) inputs.

Use switches across terminals 
9-14 and 9-15 on the VFD.

Install Leader-Follower connection 
wiring if desired to operate 2nd 
VFD at the same speeds.

F7

EXAMPLE OF OPERATION OF 2 VFDS BY A CO2 CONTROLLER.

USE WITH A CO2 CONTROLLER

The example below corresponds to the example in the section “Scaling and Response to Analog Inputs”. 
The scaling parameter settings for the FA VFD in your application are likely to be different.

If both VFDs are to run at the same speed, no scaling 
parameters need be applied to the EA VFD in this example 
since it is controlled as a “Follower”.

If it is desired that the VFDs should shut off when CO2 
levels drop below a setpoint, connect the Normally 
Open contacts of the CO2 controller (terminals 3 & 4) 
to terminals 9 & 12 of the FA VFD. Adjust the operating 
parameters of the CO2 controller to set the relay setpoint.

$*1'

$

$*1'

$,

9

$*1'

$,

6&5

9)'

($

6LJQDOFDEOHVKLHOGVFUHHQ

)UHTXHQF\,QSXWP$

)UHTXHQF\,QSXW&RPPRQJURXQG

$, $,

)RUP$LQSXWSODFH
-XPSHURU6ZLWFK$,DW
723RU21SRVLWLRQ

$*1'

$

$*1'

$,

9

$*1'

$,

6&5

9)'

)$

6LJQDOFDEOHVKLHOGVFUHHQ

)UHTXHQF\,QSXWP$

)UHTXHQF\,QSXW&RPPRQJURXQG

,QVWDOOMXPSHUEHWZHHQ IRU
FRQVWDQWRSHUDWLRQ

$, $,

,QVWDOOMXPSHUEHWZHHQ IRU
FRQVWDQWRSHUDWLRQ

2QERDUG9$&3RZHU

9$&SRZHUDYDLODEOHKHUH

9ROW

P$

/&'

52//

6$9(

0(18

&2

&20

3:5

12
5HOD\

&2:RU&2'&21752/

1RWH,QVWDOOMXPSHUVDWWKHORZYROWDJHWHUPLQDO
VWULSLQWKH(59HER[EHWZHHQWHUPLQDOV DQG
 IRUFRQVWDQWRSHUDWLRQ

3$5$0(7(56(77,1*6%27+9)'V

3DUDPHWHU

6HWWLQJ

3DUDPHWHU'HVFULSWLRQ

 $,

(QDEOHV)UHTXHQF\WREHFRQWUROOHGE\
DQDORJLQSXWVLJQDOIURPH[WHUQDO
FRQWURO

3URSHUO\VFDOHVGLVSOD\RILQSXW

P$

6HWVGLVSOD\XQLWVDVP$PSV

P$

3URSHUO\VFDOHVGLVSOD\RILQSXW

P$

3URSHUO\VFDOHVGLVSOD\RILQSXW

3$5$0(7(56(77,1*6)$9)'

+]

6HWV0LQLPXP6SHHGRI9)'

+]

6HWV0D[LPXP6SHHGRI9)'

6FDOHVWKHUHVSRQVHRIWKH9)'WR
WKH&2&RQWUROOHU2XWSXW

6FDOHVWKHUHVSRQVHRIWKH9)'WR
WKH&2&RQWUROOHU2XWSXW

Содержание ACS320 series

Страница 1: ...FD KEYPADS IN E BOX SUPPLEMENTAL MANUAL FACTORY INSTALLED ABB VARIABLE FREQUENCY DRIVES VFD IN RENEWAIRE ERV VENTILATORS RENEWAIRE COM TABLE OF CONTENTS Product info 2 Installation 3 9 Operation 10 16...

Страница 2: ...al s in accordance with all applicable codes standards and licensing requirements 4 Any structural alterations necessary for installation must comply with all applicable building health and safety cod...

Страница 3: ...w the leader s speed or at a scaled speed The VFD s are pre programmed at the factory so only a few parameters need change for a speci c installation CONNECTING EXTERNAL CONTROLS If this ERV is equipp...

Страница 4: ...und on the Internet at www abb com drives and selecting Sales Support and Service Network Softkey Auto OFF Hand Softkey Help Key Up Down Buttons The function of each Softkey changes and is shown just...

Страница 5: ...ected directly to the VFD See Fig 2 3 SPEED SIGNAL CONNECTIONS Any SPEED Signal connections are made directly to the VFD see Figures 4 6 7 The VFDs can accept 4 20mA or 0 10vdc analog control signals...

Страница 6: ...9 10 11 12 15 8 7 6 5 4 3 2 1 AGND A01 AGND AI2 10V AGND AI1 SCR VFD FA 9 10 11 12 15 8 7 6 5 4 3 2 1 AGND A01 AGND AI2 10V AGND AI1 SCR VFD EA 17 19 PARAMETER SETTINGS FA VFD Parameter Setting Param...

Страница 7: ...Speed Signal to the EA VFD Use shielded cable and ground the shield to Terminal 1 on either VFD 1 1 9 1 6 5 9 XVLQJ YGF 1 1 9 1 6 5 9 XVLQJ P RQQHFWLRQV IRU YGF RQWUROOHU 6HW XPSHU RU VZLWFK WR 27720...

Страница 8: ...in this example since it is controlled as a Follower If it is desired that the VFDs should shut off when CO2 levels drop below a setpoint connect the Normally Open contacts of the CO2 controller term...

Страница 9: ...auspices of the American Society of Heating Refrigerating and Air Conditioning Engineers ASHRAE BACnet is an American national standard a European standard a national standard in more than 30 countrie...

Страница 10: ...ange the VFD parameters as required for the speci c controls system see Control Connections and VFD Parameters below for examples see also the ABB Manuals Press the AUTO switch on the keypad 230V Powe...

Страница 11: ...eter 3 Press the SAVE softkey to set the Parameter to the selected value TO VIEW ONLY CHANGED VFD PARAMETERS 1 If EXIT is displayed above the left softkey press softkey repeatedly until MENU appears a...

Страница 12: ...or scaling and offsetting the input to the VFD output 1302 MAXIMUM AI1 100 100 Sets maximum value for analog input Used for scaling and offsetting the input to the VFD output 1304 MINIMUM AI2 20 1 20...

Страница 13: ...abb com drives SUMMARY TABLE OF COMMONLY USED PARAMETERS CONT NOTE Parameters not listed in this Table are shipped at ABB s default settings for the HVAC Application Macro Name Selection ABB HVAC Defa...

Страница 14: ...NSE LEVEL is the level of measurement of indoor air quality or occupancy at which the ERV should be operating at the Design Maximum Supply Air ow Do not change PARAMETER 2003 MAX CURRENT from RenewAir...

Страница 15: ...he Maximum Response Level The engineer wants the ERV to Run at a minimum of 700 CFM regardless of CO2 levels in order to control the level of indoor air pollutants generated by the furnishings Start t...

Страница 16: ...value of the analog signal from the controller when CO2 600ppm 6 Set the parameters that will scale the response of the VFD to the inputs from the CO2 controller Set Parameter 1301 MINIMUM AI 1 to 55...

Отзывы: