08 COMMISSIONING
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
109/174
8.2.3
Main circuit breaker (MCB) checklist
8.2.4
Motor checklist
8.2.5
Insulation tests checklist
8.2.6
Power supply checklist
8.2.7
Miscellaneous checklist
1.
Type of MCB selected as per the MCB specification from ABB
□
2.
High-voltage connections completed
□
3.
MCB ready to be tested with drive
□
4.
MCB protection relay settings tested
□
5.
Safety devices (eg, door locks) tested and in operation
□
1.
Motor installed, aligned and alignment protocol available
□
2.
Motor not coupled to driven load
□
3.
Ground connection completed
□
4.
Motor auxiliaries (eg, bearing lubrication) ready
□
5.
Control and monitoring signals connected
□
1.
All power cables to converter transformer, between drive and motor measured,
and measured values within the required limits
□
2.
Test report of the Megger insulation resistance test available
Important:
If the test is carried out by the commissioning engineer of the drive,
an additional day per drive motor combination needs to be reserved. After the
test, the feeder cables can be connected, except at the drive end. The test must
comply with the specification.
□
1.
Medium voltage available for start-up of drive
□
2.
Low voltage auxiliary power available for start-up of drive
□
1.
Sufficient number and correct type of spare parts available
□
2.
Air conditioning of drive room ready for load run of drive
□
3.
Optional equipment ready
□
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......