07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
90/184
7.5.1.3
Splitting multi-core cables
This section applies to drives without an additional cabinet.
- Check the distance between point of cable entry and closest busbar.
- Check the cable diameter.
- If distance and cable diameter do not allow bending the cable inside the terminal
compartment, separate the conductors outside of the terminal compartment.
Continue with:
- “7.5.1.4 Preparing cables for EMC plates” on page 90
- “7.5.1.5 Preparing cables for cable entries with sealing modules” on page 92
- “7.5.1.6 Preparing cables for cable entries with cable glands” on page 93
7.5.1.4
Preparing cables for EMC plates
As a standard, the cabinet is delivered for cable entry through the roof of the terminal
compartment. If cables are entered through the floor, swap entry plate and cover plate.
The orientation of the EMC plates is the same for cable entry through the roof and through the
floor, ie, the sealing grommets face upwards.
1. Remove the grommets.
2. To ensure proper sealing, cut along the marking that corresponds to the cable diameter.
Slide the grommet onto the cable.
Note:
The grommet must fit tightly to prevent water entering the cabinet. The grommets
can be discarded if cables are entered through the floor.
3. If necessary, remove the entry plate and push the cable through the entry holes.
Содержание ACS 1013-A1
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Страница 3: ...Contents ACS1000 air cooled User manual ...
Страница 5: ... 01 About this manual 01 3 14 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 15 26 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 27 50 ...
Страница 53: ... 04 Control system 04 51 66 ...
Страница 68: ......
Страница 69: ... 05 Transportation storage and disposal05 67 74 ...
Страница 76: ......
Страница 77: ... 06 Mechanical installation 06 75 82 ...
Страница 84: ......
Страница 85: ... 07 Electrical installation07 83 106 ...
Страница 108: ......
Страница 109: ... 08 Commissioning 08 107 112 ...
Страница 115: ... 09 Operation 09 113 126 ...
Страница 129: ... 10 CDP control panel 10 127 150 ...
Страница 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Страница 185: ......