
11
3
MECHANICAL INSTALLATION…
Temperature
Compensator
Location
Measuring
Electrode
Location
Reference Chamber
Reference
Electrode
Location/Filling
Hole
Blanking Plug Fitted
in (ORP) Redox
Systems
Reservoir Tube Connector
(fitted if system is used
with reservoir)
Temperature
Compensator
(Blue Ring)
Reference
Electrode
(Black Ring)
Measuring
Electrode
pH, Redox
(Red Ring)
Ensure 'O' rings
are fitted
1
2
Tighten each cable
termination to
ensure a good seal.
See Note above
Connector
(Lower Section)
Connectors
(Upper Section)
Reassemble in the reverse order to that shown in the steps in Fig.
3.6 or Fig. 3.7. Before fitting the Top Cover, however, connect the
colour coded electrode cables to the appropriate electrodes –
see Fig. 3.11.
Finally, tighten the gland nut to secure the connecting cable.
3.4
Fitting the Reservoir – Models 7651, 7652, 7660
Fig. 3.10 Location of Blanking Plug and Reservoir Tube
Connector
Caution. It is vital that the terminations are kept dry at
all times.
Note. When fitting or removing the electrode
connectors, hold the top section of the connector
firmly while rotating the bottom section.
Fig. 3.11 Fitting the Electrode Connectors
Содержание 7651
Страница 1: ...pH ORP Electrode System 7600 Series Instruction Manual IM 7650_8 ...
Страница 21: ...19 NOTES ...
Страница 22: ...20 NOTES ...