2
For indoor use only.
NOTE: The U.S. Environmental Protection Agency’s publication “Guidance for Controlling Asbestos-
Containing Materials in Buildings”, EPA 506/5-85-024, includes helpful information on asbestos
abatement. The most recent edition of this EPA publication should be read before performing any
asbestos abatement work.
Abatement Technologies strongly urges all users to follow the most recent guidelines and/or
standards published by the Occupational Safety and Heath Administration, Environmental
Protection Agency, and all other federal, state, provincial, and local regulations.
ASSEMBLY:
Unlatch the two latches that connect the top and bottom (Figure B, Item 1)
and remove the top.
Lift out the floor using the open hand slot.
Remove all component parts and replace the floor.
The unit includes 12 poles which must be assembled into 4 pole assemblies. Each complete pole
is comprised of a center pole section that has a treaded bolt on each end (Figure A, Item 1) and two
end pole sections with a corresponding nut on each end (Figure A, Item 2.) Screw an end pole
section onto each threaded end of the center pole section.
Slide a completed pole assembly into each of the four bottom corner posts on the base. (Figure A,
Item 3.) Push down to be certain that they are seated as far as they can go.
Assemble the top section to the poles by aligning all four top corner posts with the top of the poles
and exerting force downward to seat the poles as far as they can go into the corner posts (Figure A,
Item 4.)
Attach the hot and cold water supply hoses to the tap assembly.
Remove the cap and connect the drain hose to the drain fitting if a filtration pump is going to be
used. (Figure A, Item 5.)
Attach holes of the two shower curtains onto the metal hooks. Be sure the shower curtains are
inside of the lip on the base.
S4000EU SPECIFICATIONS:
Height: 81"
Length and Width: 30"
Weight: 41 Pounds