background image

2

For indoor use only.

NOTE: The U.S. Environmental Protection Agency’s publication “Guidance for Controlling Asbestos-
Containing Materials in Buildings”, EPA 506/5-85-024, includes helpful information on asbestos
abatement. The most recent edition of this EPA publication should be read before performing any
asbestos abatement work.

Abatement Technologies strongly urges all users to follow the most recent guidelines and/or
standards published by the Occupational Safety and Heath Administration, Environmental
Protection Agency, and all other federal, state, provincial, and local regulations.

ASSEMBLY:

Unlatch the two latches that connect the top and bottom (Figure B, Item 1)

 

and remove the top.

Lift out the floor using the open hand slot.

Remove all component parts and replace the floor.

The unit includes 12 poles which must be assembled into 4 pole assemblies. Each complete pole
is comprised of a center pole section that has a treaded bolt on each end (Figure A, Item 1) and two
end pole sections with a corresponding nut on each end (Figure A, Item 2.) Screw an end pole
section onto each threaded end of the center pole section.

Slide a completed pole assembly into each of the four bottom corner posts on the base. (Figure A,
Item 3.) Push down to be certain that they are seated as far as they can go.

Assemble the top section to the poles by aligning all four top corner posts with the top of the poles
and exerting force downward to seat the poles as far as they can go into the corner posts (Figure A,
Item 4.)

Attach the hot and cold water supply hoses to the tap assembly.

Remove the cap and connect the drain hose to the drain fitting if a filtration pump is going to be
used. (Figure A, Item 5.)

Attach holes of the two shower curtains onto the metal hooks. Be sure the shower curtains are
inside of the lip on the base.

S4000EU SPECIFICATIONS:

Height: 81"

Length and Width: 30"

Weight: 41 Pounds

Содержание S4000EU

Страница 1: ...Shower INSTRUCTION MANUAL Abatement Technologies Inc Abatement Technologies Ltd Georgia USA Ontario Canada 800 634 9091 905 871 4720 S4000EUMNA rev 6 1 2007 Abatement Technologies Inc AsbestosAbatement Division ...

Страница 2: ...ble Shower is designed to be used for personnel decontamination KEY COMPONENTS Aluminum top with affixed valve and shower head Four collapsible support poles Aluminum base with drain hose connection Removable floor with non skid tape Two vinyl shower curtains IMPORTANT Read the following warnings and instructions before assembling or using WARNING Failure to follow all instructions may result in s...

Страница 3: ...pole assemblies Each complete pole is comprised of a center pole section that has a treaded bolt on each end Figure A Item 1 and two end pole sections with a corresponding nut on each end Figure A Item 2 Screw an end pole section onto each threaded end of the center pole section Slide a completed pole assembly into each of the four bottom corner posts on the base Figure A Item 3 Push down to be ce...

Страница 4: ...le to ship ment from original destination unless the returned goods are free from defect and conform to specifi cations Returned goods which are found by ATI to be free from defect and to conform to specifica tions shall be held for Purchaser s shipping instructions which instructions Purchaser shall furnish promptly upon request ATI s liability shall in no event extend beyond replacement repair o...

Отзывы: