VESSINI
Installation Instructions
1
Important - Please Read
Please read these instructions carefully before starting installation and keep for future reference. Remove
all packaging and check the product for missing parts or damage before starting installation; we cannot
accept any liability for defit / refit costs where a damged or faulty product has been fitted. In addition we
do not accept responsibility for any problems that arise through incorrect installation or modification of the
product.
Due to our commitment to continuous product development we reserve the right to alter specifications
without notice. Products are guaranteed against manufacturing defects for the first purchaser only and
the guarantee is non-transferable. Our liability under any guarantee expressed or implied is strictly limited
to replacement of defective goods or a refund at our discretion and no consequential losses will be
entertained. Proof of purchase will be required.
General Installation
This product should only be installed by a suitably qualified installer.
When drilling or fixing into walls or floor it is essential that you check for pipes or wires before
commencing. These instructions are based on installation to a blockwork wall; if you are installing on to
plasterboard / stud walling please use the appropriate fixings and ensure that the wall is able to fully support
the weight of the product.
Product Care
Our products are finished to the highest standard and due care needs to be taken to ensure their looks are
retained. We recommend cleaning all products with a soft damp cloth ONLY and advise strongly against
the use of ALL cleaning products i.e. powders and liquids. If the above instructions are not followed this will
invalidate your guarantee in the event of a problem occurring.
Parts Supplied
x4
x6
x6
x2
x2
Curved Under Basin Unit
Square Under Basin Unit
or
Tools Required (Not Supplied)
Drill, 8mm Suitable Drill Bit, Phillips Screwdriver, Pencil, Level & Tape Measure.