To release the drawer, p
ull the drawer fully
out
and release
it from the runners
by
pressing the clips located underneath the drawer box
as indicated below.
Drawer
Clip
Drawer
Clip
Prior to Fitting:
It is
r
ecommended that the drawer is removed prior to installation
of the unit.
Installing the
U
nit:
Height
Above FFL
Decide on the position and height of
the unit. The recommended basin
height is between 850mm and
870mm above Finished Floor Level
(FFL)
Step1:
Plan Unit Position
Before You Start
It is recommended that the unit is secured to a suitably reinforced wall to ensure
stability. The wall plugs supplied are only suitable for solid stone or brick walls.
For plasterboard walls we would advise the unit is fitted to a MODUL basin Frame as
units are very heavy.