Side Wall Pre-install Plumbing
Plumbing feeds - Wall fed
(Dimensions shown in mm)
As plumbing connections will be from the side of the bath as shown, side wall plumbing is preferred
as it is the most straightforward and hidden solution. End wall plumbing is also possible, however
pipework will be required to follow the perimeter of the bath (see fig 4.0)
Note: when a peninsula layout in chosen, all visible pipework must also be boxed and identified as
a trip hazard.
Hot & Cold
-
Feeds should be fed in 22mm. Feeds should terminate with
full bore isolating
valves
25mm from the wall. These should be set between
20- 40mm centres off the floor
where
possible to ensure a neat connection.
Isolation valves must be located so that they are easily accessible.
Waste
- 40mm Waste outlet @ 3ltr/sec. It is recommended that the waste should be set at
between
30-100mm centre from the floor
.
Figure 4.0
Left hand bath wall fed
plumbing locations
shown.
Note
: for right handed
bath plumbing will be
mirrored to opposite
side.
It is preferable that
plumbing enters the
room anywhere in the
green area shown.
Pipework must not
enter the room in the
location shown in
orange
, as doing so
will hinder installation.
6
Aries 2000 Installation Manual v1.0