Procedure
Before beginning implementation, check the conformity of the S0 interface cards, the power
supplies, and the positions of the interface cards in the PBX and the configuration of the card
switches (see chapter 4).
It is imperative to respect the order of the following procedures.
•
Basic wiring checks
•
Check the clock pair polarity when the synchronization type is "third pair".
8.2.1 Basic wiring checks
Checking the continuity and configuration of the pairs
•
Visually check the configuration of each base station RJ45 connector and of each distribution
frame.
•
Cable test. Isolate the S0 side at the distribution frame and note the impedance of the wiring
+ base station assembly for the 2 or 3 pairs. The values observed must be the same for the
transmit and receive pairs. The clock pair impedance must be greater than approximately 80
ohms.
Checking the distances between base stations and the distribution frame
Note the observed value of the transmit pair and determine the distance between the base
station and the distribution frame using the following table.
Table 1: Determining the distance between base stations and the distribution frame
Remote
- 6/10°cable,
- 5/10°cable,
- 4/10°cable,
100 m
18.2 ohms
24.0 ohms
34.0 ohms
210 m
31.6 ohms
43.8 ohms
64.8 ohms
330 m
46.3 ohms
65.4 ohms
98.4 ohms
450 m
60.9 ohms
87.0 ohms
132.0 ohms
570 m
75.5 ohms
108.6 ohms
165.6 ohms
690 m
88.9 ohms
128.4 ohms
196.4 ohms
800 m
103.6 ohms
150.0 ohms
230.0 ohms
Содержание NeXspan C
Страница 2: ...Page 2 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 20: ...Page 20 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 66: ...Page 66 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 70: ...Page 70 01 2007 AMT PTD PBX 0020 2 4 EN Figure 4 2 Bottom view of the LD4 ST card...
Страница 134: ...Page 134 01 2007 AMT PTD PBX 0020 2 4 EN...
Страница 160: ...Page 160 01 2007 AMT PTD PBX 0020 2 4 EN...