AAS Ascent T1 Скачать руководство пользователя страница 2

2 of 4

4

Close and lock front panel.

Now follow the 

Activation Guide

 to create 

an account and begin using Ascent.

INSTALLATION COMPLETE!

N

3

Connect wires

Feed wires through back of 

unit and connect as shown.

Before proceeding,

double check that wiring is 

correct and unit has power!

For additional wiring 

options, see 

page 3

.

STOP!

If you will not be using the supplied 12-VAC 

transformer, please go to 

page 4 

and follow the 

procedure, 

Using a Third-Party Power Source

.

Do not exceed 24 VAC/DC! Failure to choose a 

compatible power source can damage unit!

CAUTION!

QUICK  START

 

GUIDE

© 2016 Security Brands, Inc.

QSG-16T1-EN           Rev. B (9/2016)

GROUND

LOAD

STATUS POWER

EVENT

RELAY A

RELAY B

Ascent T1 Terminal Block

N/O

GND

POS. (

+)

NEG. (

–)

N/O

CO

M

N/C

N/O

CO

M

N/C

CO

M

N/O

POWER 

12–24 VAC/DC

 

Gate Operator / Door Opener

POS. (

+)

NEG. (

–)

CO

M

RADIO

CO

M

FREE EXIT

CO

M

REVERSE LOOP

CO

M

OPEN

ST

OP

CLOSE

12–24 VAC/DC

Third-Party 12–24-VAC/DC

Power Source

Relay B can be wired to a second device 

in the same manner.

+ –

OR

Supplied 12-VAC Transformer

NOTE: 

The GROUND 

terminal is optional 

unless required by local 

code(s).If using, please 

connect to earth ground 

or equivalent.

Отзывы: