Aarrow Becton 7 Скачать руководство пользователя страница 24

24

Becton Multifuel Stoves

INSTALLATION

Primary flow and return pipes should be 28mm
diameter. The cylinder should be installed at a
higher level than the appliance, and as close to it as
possible (the higher the cylinder the faster the
circulation). The flow and return pipes should not
be longer than 20ft each. Pipe runs should rise
continually from the boiler to the cylinder. 
A radiator of approximately 25 sq.ft. should be
connected into the primary circuit, if installed in the
bathroom it provides a means of drying towels in
the summer.

Safety Vent Circuit

This circuit consists of a cold feed pipe, expansion
pipe, and expansion tank. The possibility that water
may boil can never be completely ruled out, and it
is therefore vital to ensure that cold water can be
supplied to the boiler and steam vented from it at all
times.

The expansion tank should have a capacity of at
least 7 % of the system's water capacity. The cold
water feed pipe should be at least 22mm diameter.

There must not be any shut off valves in the circuit.
Pipes should be run to avoid air locks. A spring
safety valve should be fitted to the expansion pipe
close to the boiler.

It is often possible, and is good practice, to utilise
the primary flow and return as part of the safety
circuit. The ball valve should have a copper ball.
The overflow pipe from the expansion tank should
be 28mm diameter copper. Pipes in unheated
spaces must be lagged.

FINAL CHECK

Before handing over the installation to the
customer it is strongly recommended that the
appliance is lit and the functioning of the chimney,
hot water and heating system is checked.

A checklist (Pre-lighting Checks) appears in the
Operating Instructions, but in addition to this the
installer should:

Operate the heating system and set the 

pump head.

Balance the radiators.

Re-vent and ensure no air locks.

Check the circulation round the primary 

system and the heat leak radiator, 
particularly when the pump is running, to  
ensure circulation is not reversed.

Be sure that the chimney is operating and 

that ALL smoke and fumes are vented to 
the atmosphere through the chimney 
terminal.

Check all joints and seals.

Clean the outside of the appliance to 

prevent any stains becoming burnt on.

Check the flue draught which should read 

1 - 2mm, or 0.1 - 0.2mbar.

The following details 

must

be checked and

completed in full by the installer at the time of
installation. Please answer all questions as fully as
possible. 

Arada Ltd

can not be held responsible

for chimney or installation.

HOT WATER SYSTEMS

Is the boiler cross-flowed?                   YES / NO
Are the pipes correctly sized?

YES / NO

What is the calculated output

required to heat the system? 
Is a heat leak fitted?

YES / NO

What is the return water temperature?

Is the pump thermostatically 
controlled by a pipe stat?

YES / NO

What is the height and distance of the 

hot water tank above the stove?

Содержание Becton 7

Страница 1: ...The Becton Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Becton 7 Multifuel Rev 6 October 2005...

Страница 2: ...so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Becton Stoves that are not covered in this manual please contact the Aarrow d...

Страница 3: ...ighting The Fire 11 Over Firing 13 Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16 Firebox Liner Panels 17 Thro...

Страница 4: ...BE BURNED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPAR...

Страница 5: ...properly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Arada Ltd produce a variety of applian...

Страница 6: ...ription Visual Aid not to scale Becton Bunny Becton 7 Becton 11 Becton 18 2 Fuel retainers 2 2 2 2 3 Throat plate 1 1 1 1 4 Flue spigot 1 4 1 5 1 5 1 6 5 Hot plate 1 4 1 5 1 5 1 6 6 Ash pan 1 1 1 1 7...

Страница 7: ...tic Hot Water with add in boiler type 0 1 2 3 4 5 6 Max Output to Room kW Max Output to Water kW 3 2 4 4 3 2 6 4 8 5 5 3 5 14 4 11 5 3 6 6 5 Height mm 510 550 600 635 Width mm 400 470 580 670 Depth mm...

Страница 8: ...controlled by rotating the door knob if hot with operating tool anti clockwise to increase the the air inlet clockwise to reduce the air inlet or seal the ash door completely AARROW AIRWASH SYSTEM Th...

Страница 9: ...e coal burning position or the wood burning position This means that effective de ashing see page 13 takes place and also allows the grate to be set in the coal burning or wood burning position as ind...

Страница 10: ...two hinge pins in a direction to compensate for the misalignment fig 7 Fig 7 Refit the door and check to ensure it now sits square to the body if not repeat above steps Raising the door as follows Whe...

Страница 11: ...zebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable fuels l...

Страница 12: ...the area is well ventilated during this time OVERNIGHT BURNING The appliance will bur overnight provided Sufficient fuel is placed in the firebox The controls are set correctly Excess draught is not p...

Страница 13: ...d could easily start a fire or cause an injury Replace the ash pan and close ash door Close the fire down CLINKER The formation of clinker suggests that the unit is being over fired Any clinker formin...

Страница 14: ...ged shut down period DOOR GLASS The door glass should remain clear during normal daytimeburning Howeverundercertainconditions such as burning at a low rate with damp wood or overnight burning the glas...

Страница 15: ...fires range PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork INTERCHANGEABLE CANOPIES To fit the interchangeable canopy Fig 8 Remove the front clamps Tilt t...

Страница 16: ...EARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should proje...

Страница 17: ...e front facing up The projecting lugs sit on top of the side liners The long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front...

Страница 18: ...ring end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of...

Страница 19: ...is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the top of the flue also needs to comply with the Building Regulations The minim...

Страница 20: ...Document J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on...

Страница 21: ...Becton Multifuel Stoves 21 INSTALLATION...

Страница 22: ...ED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non insu...

Страница 23: ...nd calculations for individual heating systems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless st...

Страница 24: ...from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the appl...

Страница 25: ...pliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished w...

Страница 26: ...1 AFS001 AFS002 AFGS064 AFS010 AFS010 AFS011 AFS008 AFS008 AFS008 AFS008 AFS058 AFS050 AFS051 AFS052 AFS009A AFS009 AFS009 AFS011 2 Throat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7...

Страница 27: ...S092 AFS070 AFS089 AFS091 AFS093 AFS047 AFS047 AFS047 AFS047 AFS1077 AFS1077 AFS1077 AFS1077 9 Side Liner 10 Back Liner Set 11 Glass Replacement Kit Complete with Gasket 12 Glass Clips 13 Hinge kit Co...

Страница 28: ...AFS095 AFS096 AFS097 AFS204 AFS204 AFS204 AFS204 AFS997 AFS997 AFS997 AFS997 16 Main Door Assembly Complete with Handle Glass Gaskets Clips and Seal 17 Decorative Door Surround 18 Fire Door Locking As...

Страница 29: ...ly by a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or...

Страница 30: ...s manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 31: ...ace ment Documentation must be retained and produced in the event of a warranty claim This guarantee specifically does not cover accidental damage misuse wear tear The use of non Aarrow replacement pa...

Страница 32: ...e checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 25 of this manual If an add in...

Отзывы: