
9
CONNECTING
You may start to connect oil hose, air supply and power after the above preparations.
1.
OIL HOSE CONNECTING
See the hydraulic diagram for oil hose connecting. Make sure that no soil or other dirty things into the pipe.
2. POWER AND AIR CONNECTION
Connect power line according to the electric diagram
Thee black lines are phase wire, and blue line is N wire. Yellow and green line is for grounding. Connect air hose
(Ф10×Ф7mm) (provided by user) with the air inlet hole of the oil spray.
3. REFILL THE TANK
Pour 16 litres of L-HM32 anti-wear hydraulic oil (provided by user) into oil tank. The highest level should be 10mm from
the top of the tank and the lowest level should be 40mm from the top of the tank (check with the detective ruler on
the oil pouring air cover).
4. SYNCHRONIZING
Connecting with power supply, the indicator is on.
Press UP button, checking running of motor. Make sure that the rotating of motor is anticlockwise, if not, cut off
power source then change the inlet orders.
If the motor works in right way, commissioning follows.
Switch on the synchronization valve, press up button unit two platforms reach the top limit.
Press DOWN button to lower the platforms to the complete bottom.
Try the above operation twice.
Switch off the valve.
Now, the lift is in normal working status and two platforms should be synchronized well.
If still not synchronized, press UP button with synchronization valve on, and switch off valve at any height when two
platforms at same level.
Press DOWN button until lowest height.
Содержание AutoLift AL-3000BG
Страница 13: ...13 OVERALL DIAGRAM ...
Страница 14: ...14 SPACE REQUIRED ...
Страница 16: ...16 HYDRAULIC CONNECTION ...
Страница 17: ...17 PNEUMATIC SYSTEM 1 AIR FILTER 2 ELECTROMAGNETIC REVERSING VALVE 3 MAIN CYLINDER 4 ASSISTANT CYLINDER ...
Страница 18: ...18 WIRING DIAGRAM ...