95
9.
OAT
- Outside air inlet temperature (°F).
10.
LATA
-
Leaving
air probe "A"
temperature (°F).
11.
LATB
-
Leaving
air probe "B"
temperature (°F).
12.
ManSTG -
Manual override stage for
system
testing.
Any
override
automatically cancels after ten minutes; 0
indicates
normal
operation,
1-6
corresponds to stages 1-6 being forced
on. Stage 1, the SCR, is forced to 50%.
System Setting Screens
These screens are access by pressing the up
button and then entering the technician
password
2425
. The screens are scrolled
through by pressing either right or left
buttons on the controller. Adjustment is made
by pressing the up and down buttons. After a
short time of inactivity, the screen will go
back to the Status Display Screens.
1.
StartDly -
Seconds of delay after the
'Enable' call before heating starts. This is
to allow the Supply Fan to come up to
speed. Supply Fan VFD’s have a 45
second ramp up time. Range = 1sec-
60sec, and the default is 15sec.
2.
BelowLLT
- "Below Low Limit Time".
Range = 10sec-1800sec, and the default
is 10sec. If ‘LLTset’ temperature is not
reached within
‘BelowLLT’
after
reaching full output, the status relay will
operate.
3.
Stages
- Number of stages. Range = 1-6,
and the default is 1. The number of stages
can be determined using Table 28.
Table 28 - Stages of Electric Preheat
Tonnages
Feature 14B
Stages
A Cabinet
RN 6-8 and
10 tons
G = 10 kW
1
J = 20 kW
K = 30 kW
2
L = 40 kW
M = 50 kW
3
N = 60 kW
B Cabinet
RN 9 and
11-15 tons
J = 20 kW
1
K = 30 kW
2
L = 40 kW
M = 50 kW
3
N = 60 kW
P = 70 kW
4
Q = 80 kW
C Cabinet
RN 16-25
and 30 tons
J = 20 kW
1
K = 30 kW
2
L = 40 kW
M = 50 kW
3
N = 60 kW
P = 70 kW
4
Q = 80 kW
R = 90 kW
5
S = 100 kW
T = 110 kW
6
U = 120 kW
4.
LATset
- Leaving air temperature
setpoint. Range = 35°F-80°F, and the
default is 50°F.
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Страница 36: ...36 Figure 9 Steel Mounting ...
Страница 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Страница 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Страница 129: ...Maintenance Log E Coated Coil ...