AAON PT-Link II LON-3 Скачать руководство пользователя страница 2

The following steps are a quick means to get the PT-Link II LON-3

®

 

operational for many simple installations. This quick start depends on 

the ability of the front end to accurately and successfully obtain the 

required information directly over the LON

®

 connection. If the front 

end cannot successfully do this, it will be necessary to manually obtain 

an XIF file from the PT-Link as described on 

page 7

 in the 

PT-Link 

II LON-3 Technical Guide

 and then to manually commission the PT-

Link II LON-3

®

 device.

1.    Familiarize yourself with the PT-Link II components  

 (

Figure 1

). 

NOTE: 

The DIP Switches should be left in their  

 

default positon which is all OFF. They are not used in this  

 application.

2.  Connect your PT-Link II LON-3

®

 to the Unit Controller on  

 

your system (only one) and connect your PT-Link II to the  

 

LON Network (

Figure 2, page 3

). 

3.  Power up the PT-Link II LON-3

®

 with an appropriately sized  

 

isolated 24 VAC power. (Note that the Unit Controller  

 

should already be powered up and running). Do not use the  

 

same power for both the PT-Link and the Unit Controller,  

 

improper wiring of these two devices on the same power 

 

source will cause damage to both the PT-Link and the  

 

Unit Controller as they do not have isolated communications. 

4.  Allow at least 3 minutes for the PT-Link II LON-3

®

 to learn 

 

internally all its information and prepare the data tables; after  

 

this point, use the learning capabilities of your front end to  

 

discover the PT-Link device on the LON network and  

 

subsequently to discover the points provided by the PT-Link  

 gateway. 

 

Quick Start Guide

Figure 1:  PT-Link II LON-3

®

 Dimensions and Components 

Отзывы: