41
The modules can be moved by rolling them
on pipes. The pipes should be spaced a
maximum of one foot apart. See the
following figure.
Figure 6 - Moving Module with Pipes
2. Remove module shipping covers. Check
to make sure neoprene gasket is installed on
downstream edge of each section. If any
neoprene gasket is damaged or missing it
should be repaired with 3/8” thick low-
durometer neoprene.
Figure 7 - Neoprene Gasket
3. Correctly orient the second section and
move it close to the first, while aligning the
two sections. The split unit lifting lugs
should be removed once there is no longer a
need to lift the section.
Figure 8 - Module Connection
4. Pull the two sections together using a
come-along attached to the lifting points on
the base rail.
Figure 9 - Module Connection Example
As the sections come together make sure the
integrated splice on the unit walls and roof
correctly overlap the walls and roof of the
adjoining module.
Содержание M3 Series
Страница 53: ...53 Figure 28 Example Blow Through AAONEcat32 Rating Sheet ...
Страница 67: ...67 Figure 38 Cartridge Bag Filter Layout Viewed from Upstream Side Filters Face Load Into Type 8 Holding Frame ...
Страница 73: ...73 ...
Страница 74: ...74 ...
Страница 75: ...75 ...