Supply
Air
Figure 3 - H3 internal control panel with top
access panel removed.
Floor Mounted Units
Make sure the unit is level and mounted on a
field supplied platform with a minimum
height to allow for proper depth of the
condensate line p-trap. Other installation
provisions may be necessary according to job
specifications.
Suspended Units
H3 Series horizontal air handling units are
equipped for suspended installations. Lift the
unit into position by supporting the unit with
the skid used for shipping. The air handling
unit must be installed level and care must be
taken to prevent damage to the cabinet.
Other installation provisions may be
necessary according to job specifications.
Figure 4 and Figure 5 show factory
recommended
methods
for
suspended
installations. It is the responsibility of the
specifying engineer or installing contractor to
ensure the installation is structurally safe and
sound.
Figure 4 - H3 Series Platform Suspension Installation