![Aaeon AOP-9150 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/aaeon/aop-9150/aop-9150_manual_3244512021.webp)
O p e r a t o r P a n e l
A O P - 9 1 5 0
Chapter 2 Hardware Installation
2-5
2.2 Panel mounting
The display panel can be mounted into the wall. You will need the
screws along with the mounting brackets, which be packed in the
accessory box. Follow the steps below:
Before you start to follow the instructions, please place the display
panel into the wall. See the following illustration on the left.
Step 1: Place the mounting brackets and plug the screw.
Step 2: Aim the mounting set at the hole on the monitor.
Step 3: Move the mounting set to the narrow gauge and fix it with
screws.
Step 4: You’ve completed the preliminary when the mounting set is
tightened. Next, repeat the steps and tighten all mounting set
around the monitor until the monitor is firmly mounting on the wall.
1
2
3
4
Содержание AOP-9150
Страница 9: ...Operator Panel A O P 9 1 5 0 Chapter 1 General Information 1 1 General Information Chapter 1...
Страница 17: ...Operator Panel A O P 9 1 5 0 Chapter 2 Hardware Installation 2 1 Chapter Hardware 2 Installation...
Страница 22: ...Operator Panel A O P 9 1 5 0 Chapter 2 Hardware Installation 2 6 Complete Illustration...
Страница 25: ...Operator Panel A O P 9 1 5 0 Chapter 3 Award BIOS Setup 3 1 Chapter Award 3 BIOS Setup...
Страница 29: ...Operator Panel A O P 9 1 5 0 Chapter 4 Driver Installation 4 1 Driver Installation Chapter 4...
Страница 33: ...Operator Panel A O P 9 1 5 0 Appendix A FAQ A 1 Appendix FAQ A...