background image

S

lide the Tie-down ( E ) ( two for each bar ) into the Cross-Bar’ s slot with 2 T-bolts M8 * 25( J ) 

follow-by; connect with Washers( L ) & Spring Washers( M ) & Plastic Adjust-Knob( F ). Tighten 
knob firmly to set Tie-down position.( Installation of the Tie-down is optional for customers’ 

personal preference ). 

P

ut the Tubular-Cabs ( D ) on each Cross-Bar’ s end. Installation of Cross-Bar Sealing Strip( G ) 

is optional. To install, place Sealing Strip( G ) on the top Cross-Bar t-slot. If Tie-down( E ) have 

been installed, measure the position for both Load Stops, mark the position and cut the Sealing 
Strip( G ) accordingly for the Cross-Bar, then place Sealing Strip on the top Cross-Bar t-slot. In 
addition insert the Sealing Strip into the Cross-Bar ‘s lower channel to reduce wind-noise. Cut 
the right length as needed. 

S

TEP 4

S

TEP 5

F

M

L

J

E

Tighten knob firmly to 

set 

Tie-down

 position.

D

Mounted on the top Cross-Bar t-slot

Mounted in the lower Cross-Bar t-slot

Cut the right 
length as needed

G

I

NSTRUCTION MANUAL

AAPRODUCTS INC.

F

or Technical Support Call:1-888-806- 3972 / 626-332-4245

Содержание APX2501 BLK

Страница 1: ...WWW AAPRODUCTSINC COM INSTRUCTION MANUAL APX2501 BLK WHT SLV Height Adjustable Aluminum Pick Up Truck Ladder Rack No drilling required...

Страница 2: ...eriodically for tightness In order to prevent installation problems any consultation or use of certi ed installer or installation service company is recommended This is a Height Adjustable aluminum pi...

Страница 3: ...mp Rubber Gasket Cross Bar Tubular Cab Tie down T Bolt M8 25 Lock Nut M8 Washer Spring Washer M8 Plastic Adjust Knob Rubber Sealing Strip 1BAR 1 1 4 2 1 2 2 6 4 6 2 2 2 2BAR 2 2 8 4 2 4 4 4 12 8 12 4...

Страница 4: ...s M8 K TIP Do NOT tighten the nuts during this process Loosen Quick release Knob of the Upright on both sides set an ideal height for the load and tighten the Quick release Knob TIP Adjust both sides...

Страница 5: ...r security Position rear Cross Bar assembly and Rubber Gaskets I as close as possible to tailgate and repeat Steps 2 Using a tape measure ensure equal front rear Cross Bar spacing and tighten rear Cla...

Страница 6: ...e top Cross Bar t slot If Tie down E have been installed measure the position for both Load Stops mark the position and cut the Sealing Strip G accordingly for the Cross Bar then place Sealing Strip o...

Страница 7: ...io CA 91761 Attn Warranty Claims In the event that a product needs to be returned an AA Products Inc Customer Service Representative will provide mailing address and any additional instructions Please...

Страница 8: ...etc which are known to the State of California to cause cancer or birth defects or other reproductive harm For more information visit www P65warnings ca gov Scan the QR code to reach our Customer Hel...

Отзывы: