3 INSTALLATION
Pag. 16 di 26
7.
Install the equipment in the mast by inserting the rollers into the appropriate sliding guides
and fasten the chains in the holes in the brackets according to the methods provided by the
mast manufacturer (
8.
Before inserting the forks or any other equipment, unscrew the central screw and then
screw it back on once the operation is completed in order not to allow the forks to come out.
9.
Connect the sideshifting pipes to cylinder and oil distributor
.
10.
Making sure that the operating pressure of the pipes is higher than or equal to that
indicated on the identification label.
11.
Lubricate the contact parts.
Picrure 10