background image

22

SYSTEM INSTALLATION

GENERAL

If the system is to be filled with water for testing or other 

purposes during cold weather and before actual operation, 

care must be taken to prevent a downdraft entering the boiler 

or freezing air from contacting the system. Failure to do so 

may cause the water in the system to freeze with resulting 

damage to the system. DAMAGE DUE TO FREEZING IS 

NOT COVERED BY THE WARRANTY.

Good practice requires that all heavy piping, etc., be support ed.

Figure 13 shows a typical primary, secondary piping method.  

This is the preferred piping method for most copper fin tube 

boilers. Other piping methods, however, may provide good 

system operation.  A prime concern when designing heating 

systems is the maintenance of proper flow through the unit 

during boiler operation. The secondary pump should be sized 

per the recommended flow rate of the boiler, see Dimension 

and Capacity Data in this manual.

A system bypass should be installed, as shown in Figure 

13, to prevent boiler circulation starvation when the system 

zones call for reduced flow.

This bypass may also be used with multiple boilers manifolded 

for reverse-return flow.  This system bypass would be installed 

from boiler outlet to suction side of pump.

HOT WATER HEATING (HYDRONIC) EQUIPMENT

The following is a brief description of the equipment required 

for the installations noted in this manual. All installations 

must comply with local code.

1. WATER SUPPLY LINE

  These boilers can be used ONLY in a forced circulation 

hot water heating system.  Since most forced circulation 

systems will be of the closed type, install the water supply 

line as shown on piping diagram, see Figure 13.

  Fast filling of large pipe, old radiator installations and 

pressure  purging  of  series  loop  systems  (where  high 

pressures  are  not  available)  requires  bypassing  of  the 

pressure reducing valve.  

  Gener ally, pressure purging is not possible with a well 

pump system. High point air venting is essential.

  If the system is of the open type, a pressure reducing 

valve will not be required as the water supply to the 

system will be controlled by a manu ally operated valve.  

An overhead surge tank is required. A minimum pressure 

of  15  psi  (100kPa)  must  be  maintained  on  the  boiler  at 

all times to ensure avoidance of potential damage to the 

boiler which may not be covered by the warranty.

2. EXPANSION TANK

  If the system is of the closed type, install an expansion 

tank as shown in Figure 13. The sizing of the expansion 

tank for a closed system is very important and is directly 

related to the total water volume of the system.  Refer 

to  “Systems  and  Equipment”  volume  of  the  ASHRAE 

handbook.

  An air separator as shown in the piping diagrams is recom-

mended especially for modern commercial hydronic systems.

3. VENT VALVES

  It is recommended that automatic, loose key or screw-

driver type vent valves be installed at each convector 

or radiator.

4. SYSTEM HEADERS

  Split systems with individual supply and return lines from 

the boiler room should normally have this piping connected 

to supply and return manifold headers near the boiler.  To 

achieve good water distribution with maximum pressure 

drop for sever al circuits, manifolds should be larger than 

system mains.

  The circuits should be spaced on the heater at a minimum 

of 3” (76mm) center to center. Install a balancing cock in 

each return line.

  Manifold headers are recommended for split systems 

with or without zone valves and also those installations 

with zone circulators. If the system is to be split at 

remote points, good practice requires special attention 

be given to main pipe sizing to allow balancing of water 

flow. 

5. COOLING PIPING

  When the boiler is used in conjunction with a refrigeration 

system it must be installed so that the chilled medium is 

piped in parallel with the boiler.  Appropriate flow control 

valves, manual or motorized, must be provided to prevent 

the chilled medium from entering the boiler.

  Water temperature in the heating system must be reduced 

to less than 100°F (38°C) before cooling system is started, 

or damage to the chiller unit may occur.

  If the boiler is connected to chilled water piping or its 

heating coils are exposed to refrigerated air, the boiler 

piping system must be equipped with flow valves or other 

automatic means to prevent gravity circulation through the 

boiler during the cooling cycle.

  Primary/secondary  pumping  of  both  the  chiller(s)  and 

the  boiler(s)  is  an  excellent  winter-summer  change-over 

method, because cooling flow rates are so much more 

than heating flow rates. In this way each system (heating 

or  cooling)  is  circulated  independently.

6.  CIRCULATING PUMP

 

FOR HOT WATER HEATING BOILERS - VB MODELS

, the 

circulating pump is NOT provided and must be field-installed.

 

NOTE:    If  a  system  pump  is  to  be  installed  on  a  VB 

model, the maximum rating of the pump motor must 

not exceed 1 hp. 

Содержание VF VB 500

Страница 1: ...ilding Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be...

Страница 2: ...known to the State of California to cause cancer birth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical know...

Страница 3: ...3 GENERAL SAFETY...

Страница 4: ...al Power 120v 60hz and 30 amps Models VB VW 500 VB VW 750 VB VW 1000 Dimensions inches mm inches mm inches mm Flue Outlet Diameter 6 152 6 152 6 152 Air Intake Diameter 4 102 4 102 4 102 Water Inlet 2...

Страница 5: ...9 42 159 2 1 0 6 32 121 1 8 0 5 110 416 4 3 1 3 12 7 32 121 1 8 0 5 40 22 VB 1000 85 322 3 9 1 2 56 212 2 8 0 9 42 159 2 3 0 7 120 454 4 9 1 5 14 8 42 159 2 3 0 7 40 22 Model No Input Rating Btu hr Ou...

Страница 6: ...d Ability 10 Location 10 Panels and Covers 10 Chemical Vapor Corrosion 11 Installtion Clearances 11 Leveling 11 Air Requirements 11 Unconfined Space 11 Confined Space 11 Fresh Air Openings for Confine...

Страница 7: ...N EXPOSED TO FLOODING IT MUST BE REPLACED Liquefied Petroleum Gas Models Boilers for propane or liquefied petroleum gas LPG are different from natural gas models A natural gas boiler will not function...

Страница 8: ...S is a normally closed pressure switch that opens when the air intake is blocked If the BIS is activated check and clear the intake of any obstructions The blocked flue pressure switch BFS activated w...

Страница 9: ...emperature Probe allows a boiler to sense the actual water temperature inside the storage tank or hydronic heating loop The boiler will modulate its firing rate in response to the actual system temper...

Страница 10: ...g cartridge or linkage T P relief valve should have a temperature rating of 210 F 99 C a pressure rating not exceeding lowest rated working pressure of any system compo nent and a discharge capacity e...

Страница 11: ...sure adequate air supply Unusually Tight Construction In unconfined spaces in buildings infiltration may be adequate to provide air for combustion ventilation and dilution of flue gases However in bui...

Страница 12: ...ThroughTwoHorizontalDucts FIGURE 9C The confined space should be provided with two permanent horizontal ducts one commencing within 12 inches 300 mm of the top and one commencing within 12 inches 300...

Страница 13: ...osure See Figure 9E Each opening should communicate directly with an additional room s of sufficient volume so that the combined volume of all spaces meets the criteria for an Unconfined Space Each op...

Страница 14: ...into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 12 inches 30 cm for appliances between 10 000 Btu hr 3 kW and 100 000 Btu hr 30kW 3...

Страница 15: ...let into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 12 inches 30 cm for appliances between 10 000 Btu hr 3 kW and 100 000 Btu hr 30...

Страница 16: ...sing TWT to exhaust flue prod ucts and PVC piping to bring combus tion air to the boiler from the outside see Figures 12 and 12C 4 Vertical Direct Vent using a vertical vent termination to exhaust flu...

Страница 17: ...direct vent installations Standard minimum vertical vent lengthis7feet 2 1m plusBoot Tee SeeFigures11 12A 12B and 12C for differences between standard and direct vent installations 3 An AL 29 C Vent V...

Страница 18: ...r parapet it must extend a minimum of 2 610mm above the wall or parapet Joints are not joined to show vent pipe orientation FIGURE 11 VERTICAL TERMINATION FIGURE 11A HORIZONTAL THROUGH THE WALL TERMIN...

Страница 19: ...d carbon monoxide detector with an alarm shall be installed APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA...

Страница 20: ...nt terminal NOTES If the exhaust vent terminal is within 10 3 0m of a wall or parapet it must extend a minimum of 2 610mm above the wall or parapet Joints are not joined to show vent pipe orientation...

Страница 21: ...OR PARAPET ON SIDEWALL VENT INSTALLATION REFER TO FIGURE 9F FOR SPACING SPECIFICATIONS FOR EXHAUST AND AIR INTAKE PIPE INSTALLATIONS CLEARANCES SUPPORT ETC REFER TO FIGURES 12 AND 12A VERTICAL AIR IN...

Страница 22: ...red by the warranty 2 EXPANSION TANK If the system is of the closed type install an expansion tank as shown in Figure 13 The sizing of the expansion tank for a closed system is very important and is d...

Страница 23: ...ra tion Pipe joint compounds soldering paste grease on tubing and pipe all tend to contaminate a system Failure to flush contaminants from a system can cause solids to form on the inside of boiler exc...

Страница 24: ...a suitable main manual shut off valve must be installed in a location complying with those codes Before attaching the gas line be sure that all gas pipe is clean on the inside To trap any dirt or for...

Страница 25: ...REQUIRED INSTALL IN PLACE OF THE DRAIN VALVE SHOWN DANGER TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATURE AT FIXTURES IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTE...

Страница 26: ...ES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT ADD AN ANTI SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES SEE TABLE 8 ONE VF MODEL VW HOT WATER SUPPLY BOILER WITH VERTICAL TANK FIGURE 14 INSTALL I...

Страница 27: ...AFE USE TEMPERATURE AT FIXTURES IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT ADD AN ANTI SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES SEE TABLE 8 FIGURE 15 INSTALL...

Страница 28: ...3 GREEN GROUND 4 2 TANK PROBE OR 2 ENABLE DISABLE Enable disable can also be used with a 24 volt thermostat Do not use tank probe when using thermostat These connections shall be made at the rear of...

Страница 29: ...132 000 13 728 000 12 636 000 11 700 000 11 232 000 10 452 000 9 360 000 8 580 000 7 800 000 7 176 000 kW 10 508 7 219 5 848 4 980 4 432 4 021 3 701 3 427 3 290 3 061 2 741 2 513 2 284 2 102 TABLE 6...

Страница 30: ...30 Wiring Diagram FIGURE 17 CONNECTION DIAGRAM...

Страница 31: ...31...

Страница 32: ...32 FIGURE 18 SCHEMATIC DIAGRAM VB VW 500 750 1000 SCHEMATIC DIAGRAM...

Страница 33: ...desired system pressure Close bypass valve and permit pressure to be established by the pressure reducing valve 2 Vent all high points in system to purge system of air Provisions should be made to per...

Страница 34: ...further adjustments on the outlet and bypass valves until the desired inlet and outlet water temperatures are reached MANIFOLD PRESSURE CONNECTIONS Take the manifold pressure refer to Table 1 by remo...

Страница 35: ...ure On Yes Off No Switch 8 Modulation On NOTE If the unit powers up with the number of stages selected by dip switches exceeding the number of FCBs the MCB will detect this condition and go into a har...

Страница 36: ...36 LIGHTING OPERATION INSTRUCTIONS FOR MODELS VB VW 500 750 AND 1000...

Страница 37: ...e cap on the gas regulator using a slotted screwdriver This will expose the offset adjustment screw Using a TORX T40 or a 5mm hex wrench carefully adjust the low fire gas setting to achieve the CO2 le...

Страница 38: ...is missing or shorted the flame will not be detected OUTPUTS FROM MCB Relay Contact Output Alarm MCB 24VAC optional Provides electrical power to operate an external alarm This can be an audio device...

Страница 39: ...splayed 4 The system then compares the temperature read from the controlling probe inlet or tank to the setpoint temperature If the temperature is less than the operating setpoint minus the differenti...

Страница 40: ...The MCB has 5 possible states and the FCB have 9 The normal MCB states sequence is to move from Idle to Pre Circulate when a call for heat is initiated Once heat has been satisfied or the Thermostat i...

Страница 41: ...ch error has occurred The system waits in this state until the MCB sends a command to clear the error and the system returns to the idle state Cold Purge State Cold purge occurs when the MCB micro com...

Страница 42: ...fo Screen Displays the following information Elapsedhoursofoperation Totaltimesystemhasbeenpoweredup Number of running minutes Number of minutes system has been in the run mode kBtu rating of the boil...

Страница 43: ...es that a fault has been detected and the system has stopped running It is on continuously for soft faults and flashes for hard faults The Yellow LED indicates that the boiler is in a ready mode waiti...

Страница 44: ...ote The MRHL can be checked by disconnecting the outlet probe from the MCB and reading the resistance across the two active pins on the connector at the end of the probe cable The value should be appr...

Страница 45: ...tion of the servo pressure regulator Replace the valve and add a gas filter in front of the new valve preventative maintenance This is a pre mix burner system The flame is not supposed to be directly...

Страница 46: ...er adapter by first removing the four 4 bolts and subsequently the blower gas kets The blower should be free to move at this point FOR DIRECT VENT UNITS It is necessary to loosen and slide the rubber...

Страница 47: ...ystemssolidsexist Asthewaterisheated these tendtodropoutdepositingasscaleorlime Thisscalemustberemoved before the heat exchanger tubes become blocked Deliming The amount of calcium carbonate lime rele...

Страница 48: ...48 notes...

Страница 49: ...49 notes...

Страница 50: ...50 notes...

Страница 51: ...is boiler under state or provincial law are limited to one 1 year duration for the boiler or any of its parts Some states and provinces do not allow limitations on how long an implied warranty lasts s...

Страница 52: ...52 500 Tennessee Waltz Parkway Ashland City TN 37015 Phone 800 433 2545 www hotwater com E Mail parts hotwater com...

Отзывы: