background image

8

  * cautIon harness has 120 vac. In operatIon.
  ** see “planning the vent system,” “Installation of vent system” and “condensate piping” for more information.

fIGure 1.

vacuuM relIef 

valve

*Install per

local codes

    M   display enclosure

  ** n  exhaust elbow assembly

  ** o  condensate tubing

    p  off/on switch

    q  display label 

    r   hot water outlet

    t  Gas supply

    u  Main Manual Gas shutoff valve

    v  union

    w   Inlet water shutoff valve

    X   cold water Inlet

    Y  Inlet dip tube

Get to Know Your water heater - Gas Models

    a  control assembly

    b  blocked Inlet switch

    c  blocked outlet switch

    d  fan prover switch

    e  blower assembly

    f  burner assembly

    G  flame sensor

    h  hot surface Igniter

    I 

junction box

    j  Gas valve assembly

    K  display board

    l  top plastic enclosure

    Z  t/p relief valve

    aa  rating plate

    bb  labels

    cc  drain valve

  ** dd  vent terminal

    ee  drain pan

    ff  anode

    GG  Insulation

    hh  upper temperature probe

    II  access door

replaceMent parts and delIMInG products

Replacement parts and recommended delimer may be ordered through 

authorized servicers or distributors. When ordering parts, provide complete 

model and serial numbers (see rating plate), quantity and name of part 

desired. Standard hardware items may be purchased locally.

caution: 

This access panel covers 

a 2” NPT plug that was required 

during  the  manufacturing  of  this 

water heater. This 2” NPT flange is 

not a cleanout fitting

, removing the 

2” NPT plug and using this fitting as a 

cleanout could void your warranty. 

access panel

features and coMponents

Содержание Vertex 100 Power Vent DV Series 120

Страница 1: ...D WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL CALL THE TECHNICAL SUPPORT PHONE NUMBER SHOWN ON THE WATER HEATER LABELING...

Страница 2: ...ed 25 Vertical Vent Terminal Installation 26 Concentric Vent Installation 27 Kit Components 27 Safety Considerations 27 Installation Procedure 1 Roof Termination see Figure C 27 direct vent diagram 30...

Страница 3: ...birth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical known to the State of California to cause cancer birt...

Страница 4: ...any electrical appliance connected to the hot water system If hydrogen is present there will probably be an unusual sound such as air escaping through the pipe as the water begins to flow There should...

Страница 5: ...5 general safety information...

Страница 6: ...h NFPA 54 Use joint compound or Teflon tape compatible with propane gas Fire and Explosion Hazard Turn off gas lines during installation Contact a qualified installer or service agency for installatio...

Страница 7: ...ings and all instructions are essential to the proper operation of the water heater and your safety Detailed installation diagrams are also found in this manual These diagrams will serve to provide th...

Страница 8: ...Surface Igniter I Junction Box J Gas Valve Assembly K Display Board L Top Plastic Enclosure Z T P Relief Valve AA Rating Plate BB Labels CC Drain Valve DD Vent Terminal EE Drain Pan FF Anode GG Insula...

Страница 9: ...ssure for Natural Gas 3 50 87kPa Minimum Supply Pressure for Propane Gas 8 00 1 99kPa Minimum pressure must be maintained under both load and no load dynamic and static conditions Recovery Capacities...

Страница 10: ...ter where an adequate supply of fresh air for combustion and ventilation can be obtained See Combustion Air and Ventilation on page 11 9 Locate the water heater where the vent and intake air piping wh...

Страница 11: ...h Do not apply insulation to the top of the water heater as this will interfere with safe operation of the blower assembly Do not cover the outer door thermostat or temperature pressure relief valve D...

Страница 12: ...do not take in to account the presence of louvers grilles or screens in the openings The required size of openings for combustion ventilation and dilution air shall be based on the net free area of e...

Страница 13: ...nstalled in the enclosure When ducts are used they shall be of the same cross sectional area as the free area of the openings to which they connect The minimum dimension of rectangular air ducts shall...

Страница 14: ...tral wires in the 120 VAC power supply are reversed the control system will declare a Fault condition and lock out heating operation will be disabled until the power supply is correctly wired The cont...

Страница 15: ...re designed to operate with water flow pressures between 15 and 25 pounds per square inch 103 kPa and 173 kPa Flow pressures above 25 pounds per square inch 173 kPa or below 15 pounds per square inch...

Страница 16: ...p This condition is not covered under the limited warranty The temperature pressure relief valve is not intended for the constant relief of thermal expansion A properly sized thermal expansion tank sh...

Страница 17: ...be blocked or reduced in size under any circumstances Excessive length over 30 feet 9 14 m or use of more than four elbows can cause restriction and reduce the discharge capacity of the valve No valve...

Страница 18: ...zing filter prior to disposal Caution must be used to ensure that the drain is free and clear of debris and will not allow backflow through the condensate hose Consideration must be given to avoid fre...

Страница 19: ...ll be installed as close to the gas inlet of the water heater as practical at the time of water heater installation The sediment trap shall be either a tee fitting with a capped nipple in the bottom o...

Страница 20: ...pipe listed above are exclusive of the termination That is the termination with an installed screen is assumed to be in the system and the remainder of the system must not exceed the lengths discussed...

Страница 21: ...eater to allow drainage of condensation INSTALLATION OF VENT SYSTEM Before beginning installation of piping system thoroughly read the section of this manual VENT PIPE PREPARATION If you are installin...

Страница 22: ...terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size gas vent directly below Keep clear of all obstru...

Страница 23: ...inlet into building or combustion air inlet to any other appliance 4 feet 1 2 m below or to side of opening 1 foot 30 cm above opening D Vertical clearance to ventilated soffit located above the termi...

Страница 24: ...ply inlet into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 9 inches 23 cm for appliances between 10 000 Btu hr 3 kW and 50 000 Btu hr...

Страница 25: ...READ THE VENT PIPE MANUFACTURER S INSTALLATION INSTRUCTIONS 1 After the points of termination have been determined use the cover plates as templates to mark the holes for the vent pipes to be inserted...

Страница 26: ...must be no closer than 24 61cm The specifications are displayed in Figures 17 and 18 NOTE Exhaust vent terminal is installed using the same procedure Flat Roof Installation On flat roof installations...

Страница 27: ...cause intermittent operation INSTALLATION PROCEDURE 1 ROOF TERMINATION see Figure 23 1 Determine best location for termination kit NOTE Roof termination is preferred since it is less susceptible to da...

Страница 28: ...nts shrubs or air conditioning equipment Termination kit positioned so it will not be affected by wind eddy that may allow recirculation of combustion products or airborne leaves or light snow Termina...

Страница 29: ...on more than 60 in See Figure 20 Do not use field supplied couplings to extend pipes Airflow restriction will occur and the heater pressure switch may cause intermittent operation 7 Cement heater comb...

Страница 30: ...distance is maintained The air intake screen can be removed for space heating at cold climate installation to prevent potential air intake freeze up If air intake screen is removed during winter to p...

Страница 31: ...s 6 inches 15 2cm and above PRIMER It is recommended that Tetrahydrofuran THF be used to prepare the surfaces of pipe and fittings for solvent welding Do not use water rags gasoline or any other subst...

Страница 32: ...distance and make a second mark as the primer and cement will most likely destroy your first one Apply primer to the surface of the pipe and fitting socket with a natural bristle brush This process so...

Страница 33: ...exhaust elbow and for obstructions in the exhaust venting and exhaust vent terminal Also verify that the vent length does not exceed the maximum allowed as shown in the Vent Section of this manual BLO...

Страница 34: ...RORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING POWER VENT WIRING SCHEMATIC Figure 34 THIS WATER HEATER IS POLARITY SENSITVE BEFORE APPLYING ELECTRICITY TO THIS...

Страница 35: ...ed OPERATING INSTRUCTIONS 1 Set the thermostat to the lowest setting 2 Set the ON OFF switch on the control panel to the OFF position 3 Turn off all electrical power to the appliance if service is to...

Страница 36: ...and on again to reset the control system Contact your dealer or servicer if continued high limit switch operation occurs It is recommended that lower water temperatures be used to avoid the risk of sc...

Страница 37: ...side the storage tank Heating cycles and ignition are managed by the control system The ECO energy cut out Flame Sensor pressure switches and Temperature Probe is monitored by the control system The C...

Страница 38: ...gniter is being energized The Igniter has been energized and the control system has sensed the required minimum igniter current The check mark icon is visual confirmation of minimum igniter current GA...

Страница 39: ...the control system Note Cycling power will not reset the control system if the condition that caused the Fault has not been corrected Control System Menus From the Desktop screen pressing the Operatio...

Страница 40: ...and description of control system menus Use the Up and Down Buttons to view all control system menus from the Main Menu With Temperatures menu selected highlighted in black in the Main Menu screen pr...

Страница 41: ...rrent Operating State see Table 4 for a description of the various operational states ECO Contact Blocked Inlet PS Blocked Outlet PS Blower Prover PS displays the current state of the switch contacts...

Страница 42: ...he control system water heater has been energized Burner On Time Total accumulated time the control system has been in the heating operating state burner run time Cycle Count Total accumulated count o...

Страница 43: ...ew details for each Fault or Alert message stored Note fault history memory is cleared after 30 days 1 Blocked Air Intake A7 51 mins ago 2 Blocked Exhaust A8 54 mins ago 3 Low Gas Pressure A6 57 mins...

Страница 44: ...Contact Information Yes Change Contact Name Change Contact Phone Current Contact Info 000 000 0000 Access Code UPDATE CANCEL Service Contact Information Using the UP and DOWN buttons select highlighte...

Страница 45: ...l cause a reaction between this rod and the water The most common complaint associated with the anode rod is one of a rotten egg smell in the hot water The smell is a result of four factors which must...

Страница 46: ...on water conductivity not necessarily water condition A corroded or pitted anode rod indicates high water conductivity and should be checked and or replaced more often than an anode rod that appears t...

Страница 47: ...14 Connect a hose to the drain valve and terminate it to an adequate drain 15 Ensure the drain hose is secured before and during the entire flushing procedure Flushing is performed with system water...

Страница 48: ...ure Pressure Relief Valve on page 17 for instructions on replacement DISCHARGE PIPE TEMPERATURE PRESSURE RELIEF VALVE Figure 37 If the Temperature Pressure Relief Valve on the water heater weeps or di...

Страница 49: ...drain valve may be due to the valve being slightly opened F The drain valve may be leaking at the tank fitting G Leakage from recirculation plug or pipe connection H Leakage from the plug under the cl...

Страница 50: ...de energized and will coast to a stop 13 Thecontrolsystemnowentersthestandbymodewhilecontinuing to monitor the internal storage tank water temperature and the state of other system devices If the tan...

Страница 51: ...y control system Igniter is energized for warm up period 24 V Gas Valve is energized gas flows to Main Burner Is flame sensed at the Main Burner control system monitors the flame sensor Control System...

Страница 52: ...s a Fault condition it will display a Fault message on the control system s LCD with an exclamation mark The control system will lock out and disable heating operation until the condition is corrected...

Страница 53: ...urface igniter is at ignition temperature causing delayed ignition which can cause a fire or explosion mark The water heater will continue to operate during an Alert condition but the water heater mus...

Страница 54: ...CHANGE BACK ADVANCED Ignition Failure Fault occurred 2 mins ago The water heater has failed to ignite the burner Call a service professional Your Company Name Here press DOWN for more The control syst...

Страница 55: ...e tube Combustion Blower is not running when energized Loose or open wiring to Combustion Blower CHANGE BACK ADVANCED Blower Prover Open Fault occurred 2 mins ago The blower prover switch remains open...

Страница 56: ...56 notes...

Страница 57: ...57 notes...

Страница 58: ...58 notes...

Страница 59: ...stalled at the heater s and operational at all times The temperature and pressure relief valve installed on the heater is not an acceptable method SERVICE AND REPAIR EXPENSES 4 Under the limited warra...

Страница 60: ...60 500 Tennessee Waltz Parkway Ashland City TN 37015 Phone 800 527 1953 Fax 800 433 2515 www hotwater com...

Отзывы: