background image

www.aosmithinternational.com

X

Y

V

W

X

Y

V

W

W

Y

V

X

Z

Y

T

X

Data subject to change INT/1108/SGS/02

Terms and conditions apply

, please refer to our website.

Flue systems SGS

Installation options

B23

C13

C33

C53

C43

A SGS water heater should be installed according category B23, 
C13, C33, C43 or C53*.  

Concentric
Diameter (mm) 

80/125 

100/150  100/150  100/150  130/200  130/200

Max. length (m) 

40  

40  

40  

15  

15  

15 

Max. 45/90° bends 

3

Parallel (standard diameter)
Diameter (mm) 

80 

100 

100 

100 

130 

130

Max. length (m) 

25  

80  

45  

25  

115  

60 

L

equivalent

/bend 90° (m)  3,9  

4,6  

4,6  

4,6  

2,4  

2,4 

L

equivalent

/bend 45º (m)  1,1  

1,2  

1,2 

1,2  

1,4  

1,4 

Parallel (larger diameter for more length)
Diameter (mm) 

100 

130 

130 

130 

150 

150

Max. length (m) 

100 

100 

100 

100 

100 

100

L

equivalent

/bend 90º (m)  4,6  

2,4  

2,4  

2,4  

2,6  

2,6 

L

equivalent

/bend 45º (m)  1,2  

1,4  

1,4  

1,4  

1,6  

1,6 

*   All SGS are also approved for installations where the unit is supplied 
  without venting materials (C63).

Concentric flues
It is not permitted to use more than the specified number of 
bends, even when the duct is shorter than the maximum 
length. A 45° bend is equivalent to a 90° bend.

Parallel flues
-  The maximum permissible length should be reduced by the 
  equivalent length of each bend. (Note: for a parallel installation 
  this means that 3 changes in direction amount to 6 bends 
  (3 in the supply duct and 3 in the flue). 
-   The maximum length also applies if a parallel installation has 
  different supply and flue duct lengths (B23, C53).
-   Combined flues (C43) shall be fitted with a condensate drain. 

Note: horizontal flue runs must be installed with a fall of at least 
5 mm per metre.

SGS 28

SGS 30

SGS 50

SGS 60

SGS 80

SGS 100

Flue systems SGS

Minimum space requirements

SGS 28

SGS 30

SGS 50

SGS 60

SGS 80

SGS 100

Minimal space for wall duct (mm)

550 

550 

550 

550 

640 

640

725 

790 

790 

790 

940 

940

1630 

2170 

2170 

2170 

2230 

2230

1460 

1480 

1480 

1480 

1620 

1620

Y * 

1010 

1030 

1030 

1030 

1170 

1170

Minimal space for roof duct (mm)

1305 

1500 

1500 

1500 

1730 

1730

680 

1035 

1035 

1035 

1120 

1120

3060 

3420 

3420 

3420 

3620 

3620

X ** 

2110 

2470 

2470 

2470 

2670 

2670

1575 

1415 

1415 

1415 

1560 

1560

Y ** 

625 

465 

465 

465 

610 

610

For the parts numbers of components and flue gas ducts, etc.
please refer to the “Maintenance and accessories” chapter.

*   Distance without concentric pipe between bend and wall duct. 
**  Distance without concentric pipe between appliance and roof duct.

Ø80/125  Ø100/150  Ø100/150  Ø100/150  Ø130/200  Ø130/200

SGS 28-60

SGS 80-100

Содержание SGS-28

Страница 1: ...d to standard solar systems Suitable in combination with storage tanks up to 3000 liters Flexible flue options maximum lenght 115m Thermocontrol for easy flexible control fault diagnosis Programmable...

Страница 2: ...053 1280 1738 2043 2737 3245 120 min T 44 C l 1350 1599 2215 2625 3540 4220 Continuous T 44 C l h 595 638 954 1164 1601 1950 Heating up time T 44 C min 22 35 23 19 17 14 30 min T 50 C l 402 565 690 77...

Страница 3: ...255 255 255 N 1485 2005 2005 2005 Ny 205 205 205 205 P 265 270 270 270 R 180 170 170 170 S 995 1505 1505 1505 W 220 240 240 240 1 Cold water connection R11 2 2 Hot water connection R11 2 3 Gas valve c...

Страница 4: ...225 N 2060 2060 Ny 205 205 P 290 290 R 225 225 S 1425 1425 W 240 240 1 Cold water connection R11 2 2 Hot water connection R11 2 3 Gas valve connection Rp3 4 4 Drain valve connection 3 4 5 Temperature...

Страница 5: ...drain 14 Hot water outlets 16 Expansion vessel 17 Three way valve 18 Water cistern 19 Float valve 23 Over pressure security group 26 Air bleed 37 Flowmeter 38 Pompmodule solar S1 T collector S2 T tan...

Страница 6: ...ncl temperature sensor S4 return solar collector GG Controller BUS link HH Temperature sensor S3 top tank F2 Fuse Connections solar controller 1 2 L Power supply 3 N 4 n a 5 n a 6 n a 7 Pump solar sys...

Страница 7: ...E Temperature sensor S2 tank FF Q T measuring incl temperature sensor S4 return solar collector GG Control BUS link HH Temperature sensor S3 top tank F2 Fuse Connections solar controller 1 2 L Power s...

Страница 8: ...es The maximum permissible length should be reduced by the equivalent length of each bend Note for a parallel installation this means that 3 changes in direction amount to 6 bends 3 in the supply duct...

Отзывы: