Drawing Number:
Drawing Date:
H-6-TC
September 07, 2008
NOTE: This drawing is not intended to describe a complete system and is not a replacement for a pro-
fessional engineering drawing. It is intended only as a guide and does not imply compliance with local
building code requirements. Confer with local building officials before installation
.
The Contractor or
engineer is to determine the necessary components and configuration of the particular system to be in-
stalled. It is the responsibility of the engineer or contractor to ensure that the installation is in accordance
with all local building codes.
37
On-Demand
Equipment List QTY
On-Demand 6
Water Heaters
Domestic Hot Water - Backup Storage / Circulation
6 On-Demand Water Heaters
Preferred Piping Installation
Storage Tank
(No Burner or
Heating Element)
Submersible
Aquastat
(set @ 20
°F below On-
Demand Temperature
Setting)
Supply Line
Expansion
Tank
On-Demand
Water Heater
Building
Circulation
Pump
Building Hot Water
Return Line
Pump / Aquastat Control Wire
Expansion
Tank
Set water Heaters
@ 20°F above storage
tank Aquastat
Gas Supply
Cold Water
Supply Line
Reference the
section on
Pump Sizing for
Storage Tank
Application.
On-Demand
Wat er Heat er
On-Demand
Water Heater
On-Demand
Water Heater
On-Demand
Water Heater
On-Demand
Water Heater
Key
Pressure Relief Valve
Check Valve
3/4" Union
3/4" Ball Valve
Boiler Drain Valve
Solenoid Valve
S
Pressure Regulator
Circulating Pump
Mixing Valve
Содержание On Demand 305 Series 100
Страница 39: ...39 Notes...
Страница 40: ...500 Tennessee Waltz Parkway Ashland TN 37015...