8.9.5
Turn on the water heater
Refer to the procedure in the user part to Turn on the water heater (see section 4.2).
8.10
Decommisioning
To decommission the water heater:
Turn off the water heater (see section 8.10.1)
Drain the water heater (see section 8.10.2)
8.10.1
Turn off the water heater
Refer to the procedure in the user part to Turn off the water heater (see section 4.3) and
isolate the water heater from the mains power supply.
8.10.2
Draining
Refer to the installation diagram (see section 8.3) when you drain the water heater:
Close the manual gas valve (10).
If applicable, close the service stop valve (11) in the hot water pipe.
Close the stop valve (10).
Open the drain valve (9).
Aerate the entire installation of air until the water heater is completely drained.
1.
2.
1.
2.
3.
4.
5.
56
Installation, Maintenance and Service part
Содержание Innovo 12-160
Страница 6: ...6...
Страница 13: ...User part 0312266_INNOVO_UKUK_V3 0 2017 02 10 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V3 0 2017 02 10 27...
Страница 28: ...28 User part...
Страница 36: ...36 Installation Maintenance and Service part...
Страница 43: ...Fig Venting systems 0312266_INNOVO_UKUK_V3 0 2017 02 10 43...
Страница 58: ...58 Installation Maintenance and Service part...
Страница 70: ...70 Installation Maintenance and Service part...
Страница 83: ...0312266_INNOVO_UKUK_V3 0 2017 02 10 83...
Страница 87: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V3 0 2017 02 10 87...
Страница 90: ...90 Installation Maintenance and Service part...
Страница 92: ...92 Installation Maintenance and Service part...