background image

6

InstallatIon requIreMents for the coMMonwealth of Massachusetts

coMMonwealth of Massachusetts

For all side wall terminated, horizontally vented power vent, direct 

vent, and power direct vent gas fueled water heaters installed in 

every dwelling, building or structure used in whole or in part for 

residential purposes, including those owned or operated by the 

Commonwealth and where the side wall exhaust vent termination 

is less than seven (7) feet above finished grade in the area of 

the venting, including but not limited to decks and porches, the 

following requirements shall be satisfied:

InstallatIon of carBon MonoXIde detectors

At the time of installation of the side wall horizontal vented 

gas fueled equipment, the installing plumber or gasfitter shall 

observe that a hard wired carbon monoxide detector with an 

alarm and battery back-up is installed on the floor level where 

the gas equipment is to be installed. In addition, the installing 

plumber  or  gasfitter  shall  observe  that  a  battery  operated  or 

hard wired carbon monoxide detector with an alarm is installed 

on each additional level of the dwelling, building or structure 

served by the sidewall horizontal vented gas fueled equipment. 

It shall be the responsibility of the property owner to secure the 

services of qualified licensed professionals for the installation of 

hard wired carbon monoxide detectors.

In the event that the side wall horizontally vented gas fueled 

equipment is installed in a crawl space or an attic, the hard wired 

carbon monoxide detector with alarm and battery back-up may 

be installed on the next adjacent floor level.

In the event that the requirements of this subdivision can not be 

met at the time of completion of installation, the owner shall have 

a period of thirty (30) days to comply with the above requirements 

provided that during said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall be installed.

approved carBon MonoXIde detectors

Each carbon monoxide detector as required in accordance with 

the above provisions shall comply with NFPA 720 and be ANSI/

UL 2034 listed and CSA certified.

sIGnaGe

A  metal  or  plastic  identification  plate  shall  be  permanently 

mounted to the exterior of the building at a minimum height of 

eight (8) feet above grade directly in line with the exhaust vent 

terminal for the horizontally vented gas fueled heating appliance 

or equipment. The sign shall read, in print size no less than one-

half (1/2) inch in size, 

“Gas vent dIrectlY Below. Keep 

clear of all oBstructIons.”

InspectIon

The state or local gas inspector of the side wall horizontally 

vented gas fueled equipment shall not approve the installation 

unless, upon inspection, the inspector observes carbon monoxide 

detectors and signage installed in accordance with the provisions 

of 248 CMR 5.08(2)(a) 1 through 4.

eXeMptIons

The following equipment is exempt from 248 CMR 5.08(2)(a)1 

through 4:
1.  The equipment listed in Chapter 10 entitled “Equipment Not 

Required To Be Vented” in the most current edition of NFPA 

54 as adopted by the Board; and

2.  Product Approved side wall horizontally vented gas fueled 

equipment installed in a room or structure separate from the 

dwelling, building, or structure used in whole or in part for 

residential purposes.

Manufacturer requIreMents - Gas 

equIpMent ventInG sYsteM provIded

When the manufacturer of Product Approved side wall horizontally 

vented gas equipment provides a venting system design or 

venting system components with the equipment, the instructions 

provided by the manufacturer for installation of the equipment 

and the venting system shall include:
1.  Detailed instructions for the installation of the venting system 

design or the venting system components; and

2.  A complete parts list for the venting system design or venting 

system.

Manufacturer requIreMents - Gas 

equIpMent ventInG sYsteM not provIded

When the manufacturer of a Product Approved side wall 

horizontally vented gas fueled equipment does not provide the 

parts  for  venting  the  flue  gases,  but  identifies  “special  venting 

systems,”  the  following  requirements  shall  be  satisfied  by  the 

manufacturer:
1. 

The  referenced  “special  venting  system”  instructions  shall 

be included with the appliance or equipment installation 

 instructions; and 

2. 

The “special venting systems” shall be Product Approved by 

the Board, and the instructions for that system shall include a 

parts list and detailed installation instructions. 

A copy of all installation instructions for all Product Approved 

side wall horizontally vented gas fueled equipment, all venting 

instructions, all parts lists for venting instructions, and/or all 

venting design instructions shall remain with the appliance or  

equipment at the completion of the installation.

Содержание Gphe 50

Страница 1: ...L DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL PLEASE WRITE TO THE COMPANY LISTED ON THE RATING PLATE ON THE WATER HEATER RESIDENTIAL GAS WATER HEATERS For Your Safety AN ODORANT IS ADDED TO THE GAS USED BY THIS WATER HEATER POWER VENTED GAS MODELS W HOT SURFACE IGNITION NOT FOR USE IN MANUFACTURED MOBILE HOMES MODEL GPHE 50 SERIES 100 Low Lead Content 500 Tennessee Walt...

Страница 2: ...y alert symbol indicates a potentially hazardous situation which if not avoided could result in property damage WARNING CAUTION CAUTION DANGER All safety messages will generally tell you about the type of hazard what can happen if you do not follow the safety message and how to avoid the risk of injury The California Safe Drinking Water and Toxic Enforcement Act requires the Governor of California...

Страница 3: ...3 GENERAL SAFETY INFORMATION ...

Страница 4: ...4 GENERAL SAFETY INFORMATION at least 18 45 7cm above the floor This will reduce but not eliminate the risk ...

Страница 5: ... Protection Association 1 Batterymarch Park Quincy MA 02269 3 The water heater when installed must be grounded in accordance with the local codes or in the absence of local codes the National Electrical Code NFPA 70 4 If after reading this manual you have any questions or do not understand any portion of the instructions call the local gas utility or the manufacturer whose name appears on the rati...

Страница 6: ... feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size gas vent directly below Keep clear of all obstructions Inspection The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation...

Страница 7: ...ng 4 Places Shown DD Plastic Top EE On Off Switch FF Exhaust Tee GG Elbow GET TO KNOW YOUR WATER HEATER GAS MODELS A Vent Pipe B Anode C Hot Water Outlet D Outlet 120 VAC F Gas Supply G Main Manual Gas Shuttoff Valve H Ground Joint Union J Sediment Trap K Outer Door L Union M Inlet Water Shuttoff Valve N Cold Water Inlet O Inlet Dip Tube P Temperature Pressure Relief Valve HH Bushing II Nipple JJ ...

Страница 8: ...8 TYPICAL INSTALLATION CONDENSATE HOSE AND DRAIN PAN FIGURE 1A ...

Страница 9: ...nship for normal adult skin If anyone using hot water provided by the water heater being installed fits into one of these groups or if there is a local code or state law requiring a certain water temperature at the point of use then special precautions must be taken In addition to using lowest possible temperature setting that satisfies demand of application a Mixing Valve should be installed at w...

Страница 10: ...stalled Water heaters are sometimes installed in locations where leakage may result in property damage even with the use of a drain pan piped to a drain However unanticipated damage can be reduced or prevented by a leak detector or water shuttoff device used in conjunction with a piped drain pan These devices are available from some plumbing supply wholesalers and retailers and detect and react to...

Страница 11: ...orine based chemicals refrigerants etc in addition to being highly flammable in many cases will also react to form corrosive hydrochloric acid when exposed to the combustion products of the water heater The results can be hazardous and also cause product failure INSULATION BLANKETS Insulation blankets are available to the general public for external use on gas water heaters but are not necessary w...

Страница 12: ...e size of openings providing fresh air into confined spaces EXHAUST FANS Where exhaust fans are installed additional air should be provided to replace the exhausted air When an exhaust fan is installed in the same space with a water heater sufficient openings to provide fresh air must be provided that accommodate the requirements for all appliances in the room and the exhaust fan Undersized openin...

Страница 13: ... a reference for the openings that provide fresh air into confined spaces only Do not refer to these illustrations for the purpose of vent installation See Installation of Vent System on pages 18 27 for complete venting installation instructions FIGURE 9 The confined space should be provided with two permanent vertical ducts one commencing within 12 inches 300 mm of the top and one commencing with...

Страница 14: ...de requirements or such conditions as high line pressure among others have installed devices such as pressure reducing valves check valves and back flow preventers Devices such as these cause the water system to be a closed system CHEMICAL VAPOR CORROSION CORROSION OF THE FLUEWAYS AND VENT SYSTEM MAY OCCUR IF AIR FOR COMBUSTION CONTAINS CERTAIN CHEMICAL VAPORS SUCH CORROSION MAY RESULT IN FAILURE ...

Страница 15: ...on 6 Spread the slit open and slip the insulation over the cold water inlet pipe Apply gentle pressure along the length of the insulation to ensure that it is fully seated around the pipe Also ensure that the base of the insulation is flush with the water heater Once seated secure the insulation with duct tape electrical tape or equivalent 7 Repeat steps 5 and 6 for the hot water outlet pipe 8 Add...

Страница 16: ...excessive temperatures and pressures in the storage tank The T P valve is not intended for the constant relief of thermal expansion Aproperly sized thermal expansion tank must be installed on all closed systems to control thermal expansion see Closed Water Systems and Thermal Expansion on page 14 and 15 If you do not understand these instructions or have any questions regarding the Temperature Pre...

Страница 17: ...tem by closing its individual manual Shuttoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 pound per square inch 3 5 kPa Connecting gas piping to the gas control valve of water heater can be accomplished by either of two methods shown in Figures 12 and 13 FIGURE 12 GAS PIPING WITH FLEXIBLE CONNECTOR FIGURE 13 GAS PIPING WITH ALL BLAC...

Страница 18: ... These PVC parts should be assembled with ASTM D 2564 grade cement Assemble Vent Pipe Assemblies 1 2 and 3 See Figure 1 prior to cementing The preferred orientation of Vent Pipe Assembly 1 Condensate U Assembly is shown in Figure 16 However this assembly may be rotated to a different orientation as needed for the specific installation requirements Note the rotational orientation of each part by ma...

Страница 19: ... L Clearance above paved sidewalk or paved driveway located on public property 7 feet 2 13 m F Clearance to outside corner 2 feet 60 cm M Clearance under veranda porch deck or balcony 12 inches 30 cm G Clearance to inside corner 18 inches 45 cm In accordance with the current ANSI Z223 1 NFPA 54 National Fuel Gas Code A vent shall not terminate directly above a sidewalk or paved driveway that is lo...

Страница 20: ...of vent pipe Check system for signs of sagging or other stresses in joints as a result of misalignment of any components in system If any of these conditions are found they must be corrected in accordance with venting instructions in this manual before completing installation and putting water heater into service NOTE A For water heaters in locations with high ambient temperatures above 100 F it i...

Страница 21: ... tubing is still attached from the air pressure switch to the port on the blower housing Make sure the plastic tubing is not folded anywhere between the pressure switch and the blower housing 6 Make sure the ON OFF switch is in the OFF position and that the outer harness is connected from the blower control box to the connector on the bottom side of the gas valve 7 If the outer harness is not fact...

Страница 22: ...line This will allow the vent to easily slide through the opening The resulting gap will be covered up by the Vent Terminal cover plate Repeat this step on inside wall if necessary SEQUENCE OF INSTALLATIONS FIGURE 18 Cut a length of PVC pipe about 3 5 inches 8 9 cm longer than wall thickness at the opening Glue vent terminal to this section of pipe Slide the wall plate over the pipe to stop agains...

Страница 23: ...tallation of a snorkel it is necessary to use two 90 elbows that shall be considered along with the additional vent pipe when calculating maximum equivalent feet of venting INSTALLATION OF VERTICAL VENT SYSTEM A proper flashing or BOOT should be used to seal the pipe where it exits the roof The total vent system should not exceed the equivalent feet of pipe as listed in Table 1 Provide support for...

Страница 24: ...C cement not included with kit and glue the two inch PVC pipe coming from the blower into the VAA 3 Perform the same sequence on the PVC pipe coming from the exhaust side vent terminal side of the VAA 4 Make sure the VAA and vent pipe is supported securely to a permanent fixture stud or wall Use standard support straps not supplied with kit that may be found at a local hardware store Failure to pr...

Страница 25: ...A and the vent pipe system Air leaks will allow flue gas by products to disseminate into the room creating an unsafe environment and could cause illness asphyxiation and or even death FIGURE 24 Typical Installation for Vertical Vent with 3 or 4 inch Pipe Installation of VAA with 3 4 inch Pipe for Horizontal Vent Some applications may require the use of 3 or 4 inch vent pipe for longer vent lengths...

Страница 26: ... above PRIMER It is recommended that Tetrahydrofuran THF be used to prepare the surfaces of pipe and fittings for solvent welding Do not use water rags gasoline or any other substitutes for cleaning PVC or CPVC surfaces A chemical cleaner such as MEK may be used CEMENT The cement should be a bodied cement of approximately 500 to 1600 centipoise viscosity containing 10 20 by weight virgin PVC mater...

Страница 27: ...d make a second mark as the primer and cement will most likely destroy your first one Apply primer to the surface of the pipe and fitting socket with a natural bristle brush This process softens and prepares the PVC or CPVC for the solvent cementing step Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer E Application of solvent cement Apply...

Страница 28: ...28 ...

Страница 29: ... located in an area where the general public does not have access If a suitable area is not available a cover should be installed over the thermostat to prevent tampering Thewatertemperaturesettingwasfactorysetatthelowesttemperature Pressing the COOLER button decreases temperature and pressing the HOTTER button increases the temperature Setting water heater temperature at 120 F 49 C Approx mark on...

Страница 30: ...eriod of time generally two weeks or more Hydrogen gas is extremely flammable and explosive To prevent the possibility of injury under these conditions we recommend the hot water faucet located farthest away be opened for several minutes before any electrical appliances which are connected to the hot water system are used such as a dishwasher or washing machine If hydrogen gas is present there wil...

Страница 31: ...rod which will slowly deplete due to electrolysis prolonging the life of the water heater by protecting the glass lined tank from corrosion Adverse water quality hotter water temperatures high hot water usage and water softening methodscanincreasetherateofanoderoddepletion Oncetheanoderod is depleted the tank will start to corrode eventually developing a leak Certain water conditions will cause a ...

Страница 32: ...ure Pressure Relief Valve must be installed in opening provided Can result in overheating and excessive tank pressure Can cause serious injury or death DRAINING AND FLUSHING It is recommended that the water heater storage tank be drained and flushed every 6 months to reduce sediment buildup The water heater should be drained if being shut down during freezing temperatures See Typical Installation ...

Страница 33: ...oose connections or the relief valve DO NOT replace the water heater until a full inspection of all possible water sources is made and necessary corrective steps taken Leakage from other appliances water lines or ground seepage should also be checked To check where threaded portion enters tank insert cotton swab between jacket opening and fitting If cotton is wet follow Draining instructions in th...

Страница 34: ...Sheet 34 Wire Screen 3 35 Wire Screen 4 36 Wall Plate 4 37 Flexible Tubing REPAIR PARTS LIST Nowthatyouhavepurchasedthiswaterheater shouldaneedeverexistfor repairpartsorservice simplycontactthecompanyitwaspurchasedfromor direct from the manufacturer listed on the rating plate on the water heater Be sure to provide all pertinent facts when you call or visit Selling prices will be furnished on reque...

Страница 35: ...he water heater 3 Ensure maximum number of elbows or maximum equivalent feet of vent or intake air pipe have not been exceeded per the installation instructions in the manual that came with the water heater 4 Ensure there are no obstructions in the vent or intake air pipe 5 Open igniter circuit 1 Check wiring to the hot surface igniter assembly replace igniter assembly if wiring is damaged or worn...

Страница 36: ...er open or shorted 1 Turn off power to the water heater Ensure all FV sensor wiring the ignitor assembly plug and the ignitor assembly socket on the bottom of the Intelli Vent control are making good contact Repair or replace any worn damaged components that are not making good connection 2 Replace the FV sensor 15 Self diagnostic check has detected the presence of fl ammable vapors from the FV fl...

Страница 37: ...37 These guidelines should be utilized by a qualified service agent TROUBLESHOOTING GUIDELINES TROUBLESHOOTING GUIDELINES ...

Страница 38: ...38 TROUBLESHOOTING GUIDELINES NOTES ...

Страница 39: ...n of it in a modified form or any attempt to repair tank leaks or parts will void this warranty servIce and laBor responsIBIlItY UNDER THIS LIMITED WARRANTY THE WARRANTOR WILL PROVIDE ONLY A REPLACEMENT WATER HEATER OR PART THEREOF THEOWNERISRESPONSIBLEFORALLOTHERCOSTS Such costs may include but are not limited to a Labor charges for service removal or reinstallation of the water heater or part th...

Страница 40: ...40 Copyright 2013 A O Smith Corporation All rights reserved 500 Tennessee Waltz Parkway Ashland City TN 37015 Technical Support 800 527 1953 Parts 800 433 2545 Fax 800 644 9306 www hotwater com ...

Отзывы: